When CICS and the MUF go down, use the following recovery and restart procedures:
Note: For more information, see the CA Datacom/DB DBUTLTY Reference Guide.
Before the re-synchronization process for resolving the in-doubt status can start, make certain the following have first been completed:
Be aware that if DCCOCPR is not in the CICS PLT or if the DBCSID does not have CONNECT=PLT, Step 3. or Step 4. in the list just shown may have to be done manually with DBOC STARTUP and possibly a DBEC P,CONNECT.
This section contains the following topics:
Copyright © 2015 CA Technologies.
All rights reserved.
|
|