Previous Topic: Install the CA-GSS/ISERVE Operator Control PanelNext Topic: Recompile under TSO


Test the Installation

The basic installation process is complete. You can verify that CA‑GSS has been installed correctly.

Follow these steps:

  1. Start CA-GSS.

    Enter the following command from the operator console:

    START GSSA
    

    Initialization proceeds rapidly; when it is complete, the following message is displayed:

    SRV220 Release 14.00.00 BASE: Initialization Complete (ssid)
    

    ssid represents the subsystem ID you selected for ISERVE.

  2. Test CA-GSS.
  3. Test the IMOD Editor.
  4. Stop CA-GSS.

    Terminate CA‑GSS properly by entering one of the following commands from an operator console:

    STOP GSSA
    P GSSA
    F GSSA, STOP
    

    If CA‑GSS does not terminate within a few seconds, enter the following command:

    F GSSA, STOP FORCE
    

    If CA‑GSS still does not terminate, cancel the address space and inspect the JESLOG and ISRVLOG listings for diagnostic messages.