CA NSM JM Option Variables
In addition to predecessors, the CA NSM JM Option lets you specify the following variables:
- Early start time indicates the earliest time a jobset can be marked as started or a job can be submitted for processing. (Think of this as the “don’t start before” time.)
- Must start time indicates the latest time that work can be started without being considered late. The work can start anytime prior to the indicated time, but not before the early start time.
- Must complete time indicates the time by which work must be completed; otherwise it is considered late. (Think of this as the “must be finished by” time.)
- Maximum time indicates the maximum length of time that work can run.
- Advanced calendar override criteria let you set conditions for holiday and non‑workday processing.