You can temporarily disable the jobs that you do not want to execute on an asset or group. The jobs disabled at the group level, can be enabled only at the group level. Similarly, jobs disabled at the asset level can be enabled only at the asset level.
To enable or disable jobs
The right pane displays all the asset jobs linked to the selected asset or group.
The job is disabled or enabled and the status changes accordingly.
|
Copyright © 2014 CA Technologies.
All rights reserved.
|
|