

Schedule Projects › How to Schedule Projects Using Open Workbench
How to Schedule Projects Using Open Workbench
There are several scheduling techniques you can use to schedule your projects using Open Workbench. The scheduling process involves the following steps:
- Determine one of the following:
- The minimum length of time required to complete each task (task duration).
- The resource usage on each task (used to automatically determine durations).
- Determine the ETC for each resource.
- Determine each task's resource loading pattern from one of the available loading patterns.
- Autoschedule the project.
Copyright © 2015 CA Technologies.
All rights reserved.
 
|
|