Previous Topic: Known Issues for Release 14.1Next Topic: Administration


Add-in Enhancements

This section provides add-in enhancements for Release 14.1.

CA Clarity PPM Integration Adaptor

The Integration Adaptor lets you import resource information using a job. The Integration Adaptor is available automatically after a new installation or upgrade.

You can verify that it is available by viewing the list of add-ins. To view the add-in list, open the Administration menu, and from Studio, click Content - Add-ins.

The following steps outline the process for uploading resource information.

  1. Create and format a delimited file.
  2. Upload the file to your secure FTP directory.
  3. Run the Integration Data Loader job.
  4. Check the error messages and logs to verify your data was updated.

Important: You can add new resources and update information for existing resources. Updating the resource information updates all fields that the delimited file contains. Because all fields are updated, it is possible to overwrite information that you want to keep.

Upgrade Action: None

VersionOne Connector

The CA Clarity PPM VersionOne Connector provides project managers visibility into agile projects and eliminates dual-time entry. Managers can track Clarity projects effectively, along with the allocated cost, resources, and time. Portfolio managers can do top-down planning with increased project transparency.

Upgrade Action: None