The Upgrade Process › Upgrade Tips
Upgrade Tips
Read the following preupgrade and postupgrade tips to ensure that your upgrade to this release works as planned.
Preupgrade
- You must have the standard base calendar available in your CA Clarity PPM application before you upgrade. If you deleted the shipped calendar named Standard, create it before upgrading. Contact CA Support if your instance is missing the Standard base calendar.
- Process all "In progress" transactions into WIP.
Verify the following conditions:
- imp_transactionimport and ppa_transcontrol are clear.
- WIP adjustments are approved.
Review and fix all invalid transactions.
- Review Time Slices.
Verify that the table is slicing out only the data that is required. If extra data is getting sliced, the database size increases and affects system performance.
- Complete and put all processes on hold.
- Remove or delete process history, notifications, jobs, or logs. Look for items that you do not need to keep.
- Pause all scheduled jobs. Take special note of the Time Slicing job. Pause it before stopping the CA Clarity PPM services prior to upgrade.
Post Upgrade
- The XML Open Gateway (XOG) client requires the Java Runtime Environment (JRE). If you use the XOG, note that the JRE is no longer available from the Clarity Software Downloads link. Review the supporting documentation and training materials you provide to your users. Wherever these materials direct users to download the JRE from within CA Clarity PPM, update the reference. Direct your users to download the JRE (Version 7) from www.java.com.
- Register any Portfolio Investment attributes that you want to display in portfolio pages. Although the required attributes display by default, you must register any other attributes (stock or custom) that you want to display.
- This product supports Microsoft Project 2010 and 2013. If you upgrade and use one of these versions, update your Microsoft Project Desktop to ensure that data populates appropriately in the Microsoft Project Interface. Set the scheduling option to Automatic when you want to open the schedule in the Microsoft Project Interface.
- If you use a custom statistics job, refer to the updated Oracle Table Analyze Job procedure in the CA Clarity PPM schema (CMN_JOB_ANALYZE_SP) and make necessary corrections in the custom statistics job.