Use the following procedure to set the system-level default project risk score and overall risk threshold. The risk threshold is the acceptable level of risk that can be tolerated without acting out the risk response strategy. You can also set the probability and impact values for the projects that have detailed risks.
You can change the existing risk thresholds, which help to calculate the degree of risk. But the changes are not based on the changes to the risk score matrix.
Follow these steps:
The risk settings page appears.
Defines the risk acceptance level for all projects.
Default: 4