Complete the following post upgrade steps:
Note: Any scheduled reports that were configured before the upgrade to this release do not automatically run after the upgrade.
Notes:
Important! Consider the configurations that you have made to items before applying them. Applying modified items overwrites your configurations.
Best Practice: If you modified stock CA Clarity PPM content, copy the modified content before upgrading. Then, apply the new incoming stock CA Clarity PPM content, and retrofit the modifications to the new content.
The upgrade preserves all preexisting Studio view configurations. If an existing view has configurations or if the object for the view is partitioned, the system does not automatically upgrade the view and/or the partition.
To determine which views were not automatically upgraded, use the Studio Views list page.
Some tips on reviewing the views:
Look for views with the following column information:
Last Version column=13.3 and the Upgraded column= unchecked.
During the upgrade, the NSQL validator script automatically verifies NSQL queries. Results are written to the admin.log. This log contains the following information:
This release contains database schema changes. To ensure that portlets work, correct any invalid NSQL queries.
Note: For information about the database schema changes, see the chapter "Data Model Changes."
Upgrade Action:
If the query can be changed in Studio, complete these steps:
If the query is in use by active portlets and cannot be edited in Studio, complete these steps:
|
Copyright © 2013 CA.
All rights reserved.
|
|