General Pages and Portlets

This section contains the following topics:

Sponsor

Program Dashboard

PM Alerts

Project Dashboard

Issues and Risks

Sponsor

Use the overview sponsor page to analyze the sponsor view of project alignment, risk, budget, and schedule. This page consists of the following portlets:

Follow these steps:

  1. Open Home, and from Personal, click General.

    The overview general page appears.

  2. Click Sponsor.

    The overview sponsor page appears.

Use the page-level filter to filter all portlets at once by business owner.

More information:

Project Schedule Portlet

Planned Cost by Project Type Portlet

Projects KPIs by OBS Portlet

The Project KPIs by OBS portlet displays key performance indicators (KPIs) for projects organized by OBS. The portlet provides a quick update on KPIs, such as business alignment, schedule %, days late, projected cost and effort variance %, risk, issues, and change requests.

The portlet displays information from both an OBS and a project perspective. The project information rolls up to each level in the OBS.

This portlet includes the following fields:

OBS/Project

Displays the OBS or project name. Expand an OBS name to display all projects that belong to that OBS. Click a project link to go to the project properties.

Manager

Displays the project manager. Click a manager link to go to the properties page of the resource.

Email Icon

Displays an email icon. Click this icon to send an email to the project manager.

Business Alignment

Displays how well the project aligns to the organization business goal. The higher the value, the stronger the alignment. The metric is used in portfolio analysis when you use comparable business alignment criteria across all portfolio investments. For each OBS unit, the average alignment is calculated.

Stoplights:
Schedule %

Displays a stoplight indicating days late as a percentage of the project timeframe, which is finish date minus start date. The calculation takes into account the project progress and baseline (if a baseline exists). The color of the stoplight indicates if the project is on schedule or late. For each OBS unit, the average schedule percentage is calculated.

Stoplights:

Days Late

Displays the number of days by which a project is late considering the following:

■ Whether or not a baseline exists

■ Project progress

For each OBS unit, the average days late is calculated.

If a baseline exists, then days late is calculated as project finish date minus baseline finish date. A positive number indicates that the project is late according to the baseline. A negative number indicates that it is early according to the baseline.

If a baseline exists and the project finish date is the same as the baseline finish date, then the project is considered late if it is not completed and it was due before today’s date. In this case, days late is calculated as today’s date minus project finish date.

If there is no baseline, then days late is calculated if the project is not completed and it was due before today’s date. In this case, days late is calculated as today’s date minus project finish date.

Projected Cost Variance %

Displays a stoplight indicating the projected cost variance as a percentage of BAC cost. For each OBS unit, the average projected cost variance percentage is calculated.

Formula: (((ETC Cost + Actual Cost (ACWP)) - BAC Cost) / BAC Cost) * 100

Stoplights:

Projected Effort Variance %

Displays a stoplight indicating the projected effort variance as a percentage of BAC effort. For each OBS unit, the average projected effort variance percentage is calculated.

Formula: ((EAC Effort – BAC Effort) / BAC Effort) * 100

Stoplights:

Risk

Displays a stoplight based on the project risk score. The project risk score determines the color of the stoplight. For each OBS unit, the average risk score is calculated.

Stoplights:

Issue

Displays a stoplight based on the highest issue priority of the issues on the project. Issues with a status of “Resolved” or “Closed” are excluded. For each OBS unit, the issue stoplight is calculated as the highest issue priority of its projects.

Stoplights:
Change

Displays a checkmark if at least one change request exists on the project. Change requests with a status of “Resolved” or “Closed” are excluded. For each OBS unit, the change checkmark displays if at least one project in the OBS has a change request.

The following fields are available for this portlet and you can add them through the configure option:

For more information, see the Personalizing CA Clarity PPM User Guide.

Days Late %

Displays days late as a percentage of the project timeframe, which is the finish date minus the start date. The calculation takes into account the project progress and baseline (if a baseline exists). The days late percentage shows the proportion by which a project is late. One day late in a six-month project does not have the same impact as one day late in a one-month project. For each OBS unit, the average days late percentage is calculated.

Schedule

Displays a stoplight indicating the number of days a project is late, considering the project progress and whether a baseline exists for the project. The color of the stoplight indicates if the project is on schedule or late. For each OBS unit, the average schedule is calculated.

Stoplights:

Projected Cost Variance

Displays the variance between the estimated plus actual cost and the baseline cost. For each OBS unit, the average projected cost variance is calculated.

Formula: ((ETC Cost + Actual Cost (ACWP)) - BAC Cost)

Projected Effort Variance

Displays the variance between EAC effort and baseline effort. For each OBS unit, the average projected effort variance is calculated.

Formula: (EAC Effort – BAC Effort)

Project Schedule Portlet

The Project Schedule portlet displays project type, risk, planned cost, and schedule in a Gantt chart format.

The following fields display on the portlet:

Dashboard Icon

Displays an icon that links to the project dashboard.

Project

Displays the name of the project. Click a project name link to go to the properties page of the project.

Project Type

Displays the project type.

Risk

Displays a stoplight that helps you assess the risk of a project. The total risk score of the project determines the color of the stoplight.

Stoplights:
Planned Cost

Displays the amount of planned cost for the project.

Schedule

Displays a Gantt chart. Each Gantt bar in the chart represents the length of a project.

For more information, see the Project Management User Guide.

This portlet is based on the Project object provider. Fields included in the object provider are available to this portlet and may be added through the configure option.

Planned Cost by Project Type Portlet

The Planned Cost by Project Type portlet is a pie chart that shows the percentage amount of planned cost for each project type. Each pie slice corresponds to a project type. Mouse over a pie slice to display the total planned cost amount for a project type.

This portlet is based on the Project object provider. Fields included in the object provider are available to this portlet and may be added through the configure option.

Program Dashboard

Use the overview program dashboard page to review the program cost and schedule. Compare this data to the cost and schedule of projects belonging to the program. The page provides program managers more visibility and control into program governance.

The overview program dashboard page consists of the following portlets:

Follow these steps:

  1. Open Home, and from Personal, click General.

    The overview general page appears.

  2. Click Program Dashboard.

    The overview program dashboard page appears. Use the page-level filter to filter both portlets at once by the program.

More information:

Program Manager Cost Dashboard Portlet

Program Manager Schedule Dashboard Portlet

Program Manager Cost Dashboard Portlet

The Program Manager Cost Dashboard portlet displays cost and effort performance of projects belonging to a program. This portlet compares a program budget to the cost performance of its projects.

The information displayed in this portlet is also available on the Schedule & Performance and Financial Summary properties of each project.

See the Project Management User Guide and Financial Management User Guide for more information.

The following fields display on the portlet:

Dashboard Icon

Displays an icon that links to the project dashboard.

Project

Displays the name of the project. Click a project name link to go to the properties page of the project.

Risk

Displays a stoplight based on the project risk score. The project risk score determines the color of the stoplight.

Stoplights:
Stage

Displays the stage in the project lifecycle.

Finish

Displays the finish date of the project.

Planned ROI

Displays the ratio of money gained or lost on this project relative to the amount of money invested.

Source: Financial Summary properties page of the project.

Planned IRR

Displays the Internal Rate of Return or the discount rate used to achieve zero NPV for an investment.

Source: Financial Summary properties page of the project.

BAC Cost

Displays the system-calculated value of baseline at completion, which is the baseline cost at the time of the current baseline revision.

Source: Schedule & Performance properties page of the project.

Actual Cost (ACWP)

Displays the system-calculated value of actual cost of work performed (ACWP), which is the total direct cost incurred in performing work based on posted actuals.

Source: Schedule & Performance properties page of the project.

EAC Cost

Displays the system-calculated value of estimate at completion, which is the total cost of actual work completed to date and the predicted cost of finishing the remaining work.

Source: Schedule & Performance properties page of the project.

Projected Cost Variance

Displays the variance between the estimated plus actual cost and the baseline cost.

Source: Schedule & Performance properties page of the project.

Formula: ((ETC Cost + Actual Cost (ACWP)) - BAC Cost)

Projected Cost Variance%

Displays a stoplight indicating the projected cost variance as a percentage of BAC cost.

Source: Schedule & Performance properties page of the project.

Formula: (((ETC Cost + Actual Cost (ACWP)) - BAC Cost) / BAC Cost) * 100

Stoplights:

Cost Drill Down

Displays an icon that links to a page with the following portlets:

The following aggregate amounts are provided at the bottom of the page:

Project

Displays the aggregate percentages and cost amounts of projects belonging to the program. The aggregate amounts are averages for Planned ROI and Planned IRR. The aggregate amounts are sums for BAC Cost, Actual Cost (ACWP), EAC Cost, and Projected Cost Variance.

Program

Displays the program Budgeted Cost.

Source: Financial Summary properties page of the program.

Variance

Displays the difference between the program Budgeted Cost and the total EAC cost of the projects in the program.

The following fields are available for this portlet and you can add them through the configure option:

For more information, see the Personalizing CA Clarity PPM User Guide.

Start

Displays the start date of the project.

Project Manager

Displays the project manager of the project.

Planned Cost

Displays the planned cost of the project.

Source: Financial Summary properties page of the project.

Planned Capital Cost

Displays the planned capital cost of the project.

Source: Financial Summary properties page of the project.

Planned Capital %

Displays the percentage of the planned capital cost of the project.

Source: Financial Summary properties page of the project.

Formula: (Planned Capital Cost / Planned Cost) * 100

Planned Operating Cost

Displays the planned operating cost of the project.

Source: Financial Summary properties page of the project.

Planned Operating %

Displays the percentage of the planned operating cost of the project.

Source: Financial Summary properties page of the project.

Formula: (Planned Operating Cost / Planned Cost) * 100

Planned Benefit

Displays the planned benefit of the project.

Source: Financial Summary properties page of the project.

Planned NPV

Displays the net present value of the project by calculating the total cost of capital and a series of future payments and income.

Source: Financial Summary properties page of the project.

Planned Breakeven

Displays the date when the expected cash flow equals the cash outlay for the project. The breakeven date matches with the payback period.

Source: Financial Summary properties page of the project.

Planned MIRR

Displays the Modified Internal Rate of Return or the rate used to measure the attractiveness of the project.

Source: Financial summary page of the investment.

Planned Payback (Months)

Displays the number of periods (in months) needed for the sum of the expected cash flows to equal the initial cash outlay for the project.

Source: Financial Summary properties page of the project.

BAC

Displays the system-calculated value of the baseline effort (actuals plus remaining ETC) at the time of the current baseline revision.

Source: Schedule & Performance properties page of the project.

Actuals

Displays the system-calculated value of the actual effort posted to the tasks in the project.

Source: Schedule & Performance properties page of the project.

ETC

Displays the system-calculated value of the estimated effort to complete the project.

Source: Schedule & Performance properties page of the project.

EAC

Displays the system-calculated value of the estimated effort at completion (actuals plus remaining ETC) of the project.

Source: Schedule & Performance properties page of the project.

Projected Effort Variance

Displays the variance between EAC effort and baseline effort.

Source: Schedule & Performance properties page of the project.

Formula: (EAC Effort – BAC Effort)

Projected Effort Variance %

Displays a stoplight indicating the projected effort variance as a percentage of BAC effort.

Source: Schedule & Performance properties page of the project.

Formula: ((EAC Effort – BAC Effort) / BAC Effort) * 100

Stoplights:

Planned Value (BCWS)

Displays the system-calculated value of budgeted cost of work scheduled (BCWS) or the budgeted amount you can spend on the project in a given time. If time is not specified, either the current date for the project or the system date is used. BCWS is also referred to as the planned value (PV).

Source: Schedule & Performance properties page of the project.

Earned Value (BCWP)

Displays the system-calculated value of budgeted cost of work performed (BCWP). The value is calculated and recorded when you baseline a project, or when you update earned value totals. BCWP is also referred to as the earned value (EV) and represents the amount of budgeted cost (BAC) completed based on performance. Performance is measured using the Task EV Calculation method.

Source: Schedule & Performance properties page of the project.

Cost Variance (CV)

Displays the system-calculated value of cost variance. The cost variance is the value of what is accomplished to date as opposed to what is spent to date.

Source: Schedule & Performance properties page of the project.

Schedule Variance (SV)

Displays the system-calculated value of schedule variance. The schedule variance is the value of what is scheduled to date as opposed to what is performed to date. A positive value indicates that the work is ahead of the baseline schedule. A negative value indicates that the work is behind the baseline schedule.

Source: Schedule & Performance properties page of the project.

Cost Variance %

Displays cost variance as a percentage. It is calculated as the percentage of cost variance over the amount of the budgeted cost of work performed (BCWP).

Source: Schedule & Performance properties page of the project.

Formula: ((BCWP – ACWP) / BCWP) * 100

Schedule Variance %

Displays schedule variance as a percentage. It is calculated as the percentage of schedule variance over the amount of the budgeted cost of work scheduled (BCWS).

Source: Schedule & Performance properties page of the project.

Formula: ((BCWP – BCWS) / BCWS) *100

Cost Performance Index (CPI)

Displays the system-calculated value of cost performance index (CPI), which is an efficiency rating for work accomplished. A value greater than or equal to one indicates a favorable condition. A value of less than one indicates an unfavorable condition.

Source: Schedule & Performance properties page of the project.

Schedule Performance Index (SPI)

Displays the system-calculated value of schedule performance index (SPI), which is the ratio of work performed to work scheduled. A value greater than or equal to one indicates work is on schedule. A value of less than one indicates the work is behind schedule.

Source: Schedule & Performance properties page of the project.

Project Costs Drill Down Page

You can drill down to the following cost views from the Program Manager Cost Dashboard Portlet:

Project Costs by Phase Portlet

The Project Costs by Phase portlet displays cost performance amounts and variances by phase. Use the portlet to identify the phases of the project plan that are over baseline from a cost standpoint.

To view this portlet, click the Costs Drill Down icon in the Program Manager Cost Dashboard Portlet.

The following fields display on this portlet:

Project

Displays the project name. Click a project name to view the project properties page.

Phase

Displays the phases of a project. Click a phase to view the task properties page.

Status

Displays the phase status (Not Started, Started, Completed).

Start

Displays the phase start date.

Finish

Displays the phase finish date.

BAC Cost

Displays the system-calculated value of baseline at completion, which is the baseline cost at the time of the current baseline revision.

Source: Performance properties page of the task.

Actual Cost (ACWP)

Displays the system-calculated value of actual cost of work performed (ACWP), which is the total direct cost incurred in performing work based on posted actuals.

Source: Performance properties page of the task.

ETC Cost

Displays the system-calculated value of the estimated cost to complete the task. ETC cost is the aggregated total for the remaining labor and non-labor cost to complete the task.

Source: Performance properties page of the task.

EAC Cost

Displays the system-calculated value of estimate at completion, which is the total cost of actual work completed to date and the predicted cost of finishing the remaining work.

Source: Performance properties page of the task.

Projected Cost Variance

Displays the variance between the estimated plus actual cost and the baseline cost.

Source: Performance properties page of the task.

Formula: ( (ETC Cost + Actual Cost (ACWP)) - BAC Cost )

Projected Cost Variance %

Displays a stoplight indicating the projected cost variance as a percentage of BAC cost.

Source: Performance properties page of the task.

Formula: ( ( (ETC Cost + Actual Cost (ACWP)) - BAC Cost) / BAC Cost) * 100

Stoplights:

The following fields are available for adding by configuration to this portlet.

For more information, see the Personalizing CA Clarity PPM User Guide.

Baseline Start

Displays the task baseline start date.

Baseline Finish

Displays the task baseline finish date.

BAC

Displays the system-calculated value of the baseline effort (actuals plus remaining ETC) at the time of the current baseline revision.

Source: Performance properties page of the task.

Actuals

Displays the system-calculated value of the actual effort posted to the tasks in the project.

Source: Performance properties page of the task.

ETC

Displays the system-calculated value of the estimated effort to complete the task.

Source: Performance properties page of the task.

EAC

Displays the system-calculated value of the estimated effort at completion (actuals plus remaining ETC) of the task.

Source: Performance properties page of the task.

Projected Effort Variance

Displays the variance between EAC effort and baseline effort.

Source: Performance properties page of the task.

Formula: (EAC Effort – BAC Effort)

Projected Effort Variance %

Displays a stoplight indicating the projected effort variance as a percentage of BAC effort.

Source: Performance properties page of the task.

Formula: ( (EAC Effort – BAC Effort) / BAC Effort) * 100

Stoplights:

Planned Value (BCWS)

Displays the system-calculated value of budgeted cost of work scheduled (BCWS) or the budgeted amount you can spend on the task in a given time. If time is not specified, either the current date for the task or the system date is used. BCWS is also referred to as the planned value (PV).

Source: Performance properties page of the task.

Earned Value (BCWP)

Displays the system-calculated value of budgeted cost of work performed (BCWP). The value is calculated and recorded when you baseline a project, or when you update earned value totals. BCWP is also referred to as the earned value (EV) and represents the amount of baseline cost (BAC) completed based on performance. Performance is measured using the Task EV Calculation method.

Source: Performance properties page of the task.

Cost Variance (CV)

Displays the system-calculated value of cost variance. The cost variance is the value of what is accomplished to date as opposed to what is spent to date.

Source: Performance properties page of the task.

Schedule Variance (SV)

Displays the system-calculated value of schedule variance. The schedule variance is the value of what is scheduled to date as opposed to what is performed to date. A positive value indicates that the work is ahead of the baseline schedule. A negative value indicates that the work is behind the baseline schedule.

Source: Performance properties page of the task.

Cost Variance %

Displays cost variance as a percentage. The variance is calculated as the percentage of cost variance over the amount of the budgeted cost of work performed (BCWP).

Source: Performance properties page of the task.

Formula: ((BCWP – ACWP) / BCWP) * 100

Schedule Variance %

Displays schedule variance as a percentage. The variance is calculated as the percentage of schedule variance over the amount of the budgeted cost of work scheduled (BCWS).

Source: Performance properties page of the task.

Formula: ((BCWP – BCWS) / BCWS) *100

Cost Performance Index (CPI)

Displays the system-calculated value of cost performance index (CPI), which is an efficiency rating for work accomplished. A value greater than or equal to one indicates a favorable condition. A value of less than one indicates an unfavorable condition.

Source: Performance properties page of the task.

Schedule Performance Index (SPI)

Displays the system-calculated value of schedule performance index (SPI), which is the ratio of work performed to work scheduled. A value greater than or equal to one indicates work is on schedule. A value of less than one indicates the work is behind schedule.

Source: Performance properties page of the task.

More information:

Program Manager Cost Dashboard Portlet

Project Costs by Task Portlet

The Project Costs by Task portlet displays cost performance amounts and variances by task. You can use the portlet to identify tasks of the project plan that are over baseline from a cost standpoint.

To view this portlet, click the Costs Drill Down icon in the Program Manager Cost Dashboard Portlet.

The following fields display on the portlet:

Project

Displays the project name. Click a project name to view the project properties page.

Phase

Displays the phases of a project. Click a phase to view the task properties page.

Task

Displays the tasks of a project. Click a task to view the task properties page.

Status

Displays the task status (Not Started, Started, Completed).

Start

Displays the task start date.

Finish

Displays the task finish date.

BAC Cost

Displays the system-calculated value of baseline at completion, which is the baseline cost at the time of the current baseline revision.

Source: Performance properties page of the task.

Actual Cost (ACWP)

Displays the system-calculated value of actual cost of work performed (ACWP), which is the total direct cost incurred in performing work based on posted actuals.

Source: Performance properties page of the task.

ETC Cost

Displays the system-calculated value of the estimated cost to complete the task. ETC cost is the aggregated total for the remaining labor and non-labor cost to complete the task.

Source: Performance properties page of the task.

EAC Cost

Displays the system-calculated value of estimate at completion, which is the total cost of actual work completed to date and the predicted cost of finishing the remaining work.

Source: Performance properties page of the task.

Projected Cost Variance

Displays the variance between the estimated plus actual cost and the baseline cost.

Source: Performance properties page of the task.

Formula: ( (ETC Cost + Actual Cost (ACWP)) - BAC Cost )

Projected Cost Variance %

Displays a stoplight indicating the projected cost variance as a percentage of BAC cost.

Source: Performance properties page of the task.

Formula: ( ( (ETC Cost + Actual Cost (ACWP)) - BAC Cost) / BAC Cost) * 100

Stoplights:

The following fields are available for adding by configuration to this portlet.

For more information, see the Personalizing CA Clarity PPM User Guide.

Baseline Start

Displays the task baseline start date.

Baseline Finish

Displays the task baseline finish date.

BAC

Displays the system-calculated value of the baseline effort (actuals plus remaining ETC) at the time of the current baseline revision.

Source: Performance properties page of the task.

Actuals

Displays the system-calculated value of the actual effort posted to the tasks in the project.

Source: Performance properties page of the task.

ETC

Displays the system-calculated value of the estimated effort to complete the task.

Source: Performance properties page of the task.

EAC

Displays the system-calculated value of the estimated effort at completion (actuals plus remaining ETC) of the task.

Source: Performance properties page of the task.

Projected Effort Variance

Displays the variance between EAC effort and baseline effort.

Source: Performance properties page of the task.

Formula: (EAC Effort – BAC Effort)

Projected Effort Variance %

Displays a stoplight indicating the projected effort variance as a percentage of BAC effort.

Source: Performance properties page of the task.

Formula: ( (EAC Effort – BAC Effort) / BAC Effort) * 100

Stoplights:

Planned Value (BCWS)

Displays the system-calculated value of budgeted cost of work scheduled (BCWS) or the budgeted amount you can spend on the task in a given time. If time is not specified, either the current date for the task or the system date is used. BCWS is also referred to as the planned value (PV).

Source: Performance properties page of the task.

Earned Value (BCWP)

Displays the system-calculated value of budgeted cost of work performed (BCWP). The value is calculated and recorded when you baseline a project, or when you update earned value totals. BCWP is also referred to as the earned value (EV) and represents the amount of baseline cost (BAC) completed based on performance. Performance is measured using the Task EV Calculation method.

Source: Performance properties page of the task.

Cost Variance (CV)

Displays the system-calculated value of cost variance. The cost variance is the value of what is accomplished to date as opposed to what is spent to date.

Source: Performance properties page of the task.

Schedule Variance (SV)

Displays the system-calculated value of schedule variance. The schedule variance is the value of what is scheduled to date as opposed to what is performed to date. A positive value indicates that the work is ahead of the baseline schedule. A negative value indicates that the work is behind the baseline schedule.

Source: Performance properties page of the task.

Cost Variance %

Displays cost variance as a percentage. The variance is calculated as the percentage of cost variance over the amount of the budgeted cost of work performed (BCWP).

Source: Performance properties page of the task.

Formula: ((BCWP – ACWP) / BCWP) * 100

Schedule Variance %

Displays schedule variance as a percentage. The variance is calculated as the percentage of schedule variance over the amount of the budgeted cost of work scheduled (BCWS).

Source: Performance properties page of the task.

Formula: ((BCWP – BCWS) / BCWS) *100

Cost Performance Index (CPI)

Displays the system-calculated value of cost performance index (CPI), which is an efficiency rating for work accomplished. A value greater than or equal to one indicates a favorable condition. A value of less than one indicates an unfavorable condition.

Source: Performance properties page of the task.

Schedule Performance Index (SPI)

Displays the system-calculated value of schedule performance index (SPI), which is the ratio of work performed to work scheduled. A value greater than or equal to one indicates work is on schedule. A value of less than one indicates the work is behind schedule.

Source: Performance properties page of the task.

Project Costs by Resource Portlet

The Project Costs by Resource portlet displays cost performance amounts and variances by resource. Use the portlet to identify the resources that are over baseline from a cost standpoint.

To view this portlet, click the Costs Drill Down icon on the Program Manager Cost Dashboard Portlet.

The following fields display on the portlet:

Project

Displays the project name. Click a project name to view the project properties page.

Team Icon

Displays an icon that links to the team staff page of the project.

Resource/Role

Displays the resource or role allocated to the project. Click a resource or role to view the properties page of the resource or role.

Project Role

Displays the project role for the resource.

Resource Type

Displays the resource type (for example, labor, material, expense, or equipment).

Employment Type

Displays the employment type for the resource (for example, employee or contractor).

BAC Cost

Displays the system-calculated value of baseline at completion, which is the baseline cost at the time of the current baseline revision.

Actual Cost (ACWP)

Displays the system-calculated value of actual cost of work performed (ACWP), which is the total direct cost incurred in performing work based on posted actuals.

ETC Cost

Displays the system-calculated value of the estimated cost to complete the project. ETC cost is the aggregated total for the remaining labor and non-labor cost to complete the project.

EAC Cost

Displays the system-calculated value of estimate at completion, which is the total cost of actual work completed to date and the predicted cost of finishing the remaining work.

Projected Cost Variance

Displays the variance between the estimated plus actual cost and the baseline cost.

Formula: ( (ETC Cost + Actual Cost (ACWP)) - BAC Cost )

Projected Cost Variance %

Displays a stoplight indicating the projected cost variance as a percentage of BAC cost.

Formula: ( ( (ETC Cost + Actual Cost (ACWP)) - BAC Cost) / BAC Cost) * 100

Stoplights:

The following fields are available for adding by configuration to this portlet.

For more information, see the Personalizing CA Clarity PPM User Guide.

BAC

Displays the system-calculated value of the baseline effort (actuals plus remaining ETC) at the time of the current baseline revision.

Actuals

Displays the system-calculated value of the actual effort posted to the tasks in the project.

ETC

Displays the system-calculated value of the estimated effort to complete the task.

EAC

Displays the system-calculated value of the estimated effort at completion (actuals plus remaining ETC) of the task.

Projected Effort Variance

Displays the variance between EAC effort and baseline effort.

Source: Performance properties page of the task.

Formula: (EAC Effort – BAC Effort)

Projected Effort Variance %

Displays a stoplight indicating the projected effort variance as a percentage of BAC effort.

Formula: ( (EAC Effort – BAC Effort) / BAC Effort) * 100

Stoplights:

Program Manager Schedule Dashboard Portlet

The Program Manager Schedule Dashboard portlet displays schedule performance of a program and projects belonging to the program.

The following fields display on the portlet:

Dashboard Icon

Displays an icon that links to the program or project dashboard.

Program/Project

Displays the program or project name. Click a program or project link to open the properties page of the program or project.

Start

Displays the start date of the program or project.

Finish

Displays the finish date of the program or project.

Overall Status

Displays a stoplight indicating the overall status of each program or project, based on the status report with the most recent report date and a report status of final or no value selected.

Stoplights:
Schedule %

Displays a stoplight indicating days late as a percentage of the program or project timeframe, which is finish date minus start date. The calculation takes into account the program or project progress and baseline (if a baseline exists). The color of the stoplight indicates if the program or project is on schedule or late.

Stoplights:

Days Late

Displays the number of days late considering the following:

If a baseline exists, then days late is calculated as project finish date minus baseline finish date. A positive number indicates that the project is late according to the baseline. A negative number indicates that it is early according to the baseline.

If a baseline exists and the project finish date is the same as the baseline finish date, then the project is considered late if it is not completed and it was due before today’s date. In this case, days late is calculated as today’s date minus project finish date.

If there is no baseline, then days late is calculated if the program or project is not completed and it was due before today’s date. In this case, days late is calculated as today’s date minus program or project finish date.

Gantt Schedule

Displays a Gantt chart comparing the program finish date with the schedules of associated projects. The color of the Gantt bars is based on the Schedule % as follows:

The following fields are available for this portlet and you can add them through the configure option:

For more information, see the Personalizing CA Clarity PPM User Guide.

Baseline Start

Displays the baseline start date of the project.

Baseline Finish

Displays the baseline finish date of the project.

Project Manager

Displays the program or project manager.

Days Late %

Displays days late as a percentage of the program or project timeframe, which is the finish date minus the start date. The calculation takes into account the program or project progress and baseline (if a baseline exists). The days late percentage shows the proportion by which a program or project is late. One day late in a six-month program or project does not have the same impact as one day late in a one year program or project.

Schedule

Displays a stoplight indicating the number of days a program or project is late, considering the program or project progress and whether or not a baseline exists for the project. The color of the stoplight indicates if the program or project is on schedule or late.

Stoplights:
Status Indicator

Displays a stoplight that shows the status of each program or project based on its status indicator.

Source: Schedule & Performance properties page of the program or project.

Stoplights:

More information:

PMO-Project Storyboard Page Layout

PM Alerts

The overview PM alerts page provides a high-level, exception-based view of project manager activity. Alerts indicate potential problem areas to monitor within the days outlook range. By default, the days outlook considers 45 days in the past and 45 days in the future based on the current date.

If you provide a value for As of Date, the portlets display results based on the As of Date entered instead of using the current date. The results, based on the As of Date, are 45 days in the past and 45 days in the future.

If you provide a value for Days Outlook, the portlets display results based on the Days Outlook entered instead of using the default of 45 days.

You can also combine As of Date and Days Outlook.

The PM alerts page consists of the following portlets:

Follow these steps:

  1. Open Home, and from Personal, click General.

    The overview general page appears.

  2. Click PM Alerts.

    The overview PM alerts page appears.

    Use the page-level filter to filter all portlets at once by OBS, Project Manager, As of Date, and Days Outlook.

Schedule Performance Portlet

The Schedule Performance portlet displays the number of late tasks categorized as critical late, past due, or scheduled late within the days outlook as follows:

Summary tasks and milestones are not included in this portlet. Also, tasks with a status of "Completed" are not included in this portlet.

Tasks are considered late if they have a days late value, which is calculated as follows:

No columns on the graph imply that all the tasks within the days outlook are completing as scheduled.

Click a bar on the graph to go to the schedule performance drill-down page. The Schedule Performance portlet displays on this page.

Schedule Performance Drill Down Page

The Schedule Performance Drill Down Page includes the Schedule Performance Details portlet. This portlet displays a list of the critical late, past due, or scheduled late tasks within the days outlook.

Summary tasks and milestones are not included in this portlet. Also, tasks with a status of "Completed" are not included in this portlet.

To view this portlet, click a bar on the graph on the Schedule Performance portlet.

The following fields display on the portlet:

Dashboard Icon

Displays an icon that links to the project dashboard.

Project

Displays the name of the project. Click a project name link to go to the properties page of the project.

Task

Displays the name of the task. Click a task name to view the task properties.

Status

Indicates the status of the task.

Values: Not Started and Started

Classification

Displays the task grouping.

Values: Critical Late, Past Due, and Scheduled Late

Finish

Displays the finish date of the task.

Schedule %

Displays a stoplight indicating days late as a percentage of the summary task or project timeframe, which is finish date minus start date. If the task has a parent task in the WBS, then the parent task timeframe is used in the calculation. If the task is at the top level of the WBS and does not have a parent task, then the project timeframe is used in the calculation.

The calculation takes into account the task status and baseline (if a baseline exists). The color of the stoplight indicates if the task is on schedule or late.

Stoplights:

Days Late

Displays the number of days late considering the following:

■ Whether or not a baseline exists

■ Task status

If a baseline exists, then days late is calculated as task finish date minus baseline finish date. A positive number indicates that the task is late according to the baseline. A negative number indicates that it is early according to the baseline.

If a baseline exists and the task finish date is the same as the baseline finish date, then the task is considered late if it is not completed and it was due before today’s date. In this case, days late is calculated as today’s date minus task finish date.

If there is no baseline, then days late is calculated if the task is not completed and it was due before today’s date. In this case, days late is calculated as today’s date minus task finish date.

BAC

Displays the system-calculated value of the baseline effort (actuals plus remaining ETC) at the time of the current baseline revision.

Actuals

Displays the system-calculated value of the actual effort posted for the task in the project.

ETC

Displays the system-calculated value of the estimated effort to complete the task.

EAC

Displays the system-calculated value of the estimated effort at completion (actuals plus remaining ETC) of the task.

Projected Effort Variance

Displays the variance between EAC effort and baseline effort.

Formula: (EAC Effort – BAC Effort)

Projected Effort Variance %

Displays a stoplight indicating the projected effort variance as a percentage of BAC effort.

Formula: ((EAC Effort – BAC Effort) / BAC Effort) * 100

Stoplights:

The following fields are available for this portlet and you can added them through the configure option:

Start

Displays the task start date.

Baseline Start

Displays the task baseline start date.

Baseline Finish

Displays the task baseline finish date.

Days Late %

Displays days late as a percentage of the summary task or project timeframe, which is finish date minus start date. If the task has a parent task in the WBS, then the parent task timeframe is used in the calculation. If the task is at the top level of the WBS and does not have a parent task, then the project timeframe is used in the calculation. The calculation takes into account the task status and baseline (if a baseline exists).

Schedule

Displays a stoplight indicating the number of days a task is late, considering the task status and whether or not a baseline exists for the task. The color of the stoplight indicates if the task is on schedule or late.

Stoplights:

More information:

Schedule Performance Portlet

Milestones Portlet

The Milestones portlet provides a list of project milestones and schedule indicators within the days outlook.

The portlet includes the following fields:

Dashboard Icon

Displays an icon that links to the project dashboard.

Project

Displays the name of the project. Click a project name link to go to the properties page of the project.

Milestone

Displays the milestone name. Click the name of the milestone to go to the task properties page.

Finish

Displays the finish date for the milestone to be complete.

Schedule %

Displays a stoplight indicating days late as a percentage of the summary task or project timeframe, which is finish date minus start date. If the milestone has a parent task in the WBS, then the parent task timeframe is used in the calculation. If the milestone is at the top level of the WBS and does not have a parent task, then the project timeframe is used in the calculation.

The calculation takes into account the milestone status and baseline (if a baseline exists). The color of the stoplight indicates if the milestone is on schedule or late.

Stoplights:

Days Late

Displays the number of days late considering the following:

If a baseline exists, then days late is calculated as milestone finish date minus baseline finish date. A positive number indicates that the milestone is late according to the baseline. A negative number indicates that it is early according to the baseline.

If a baseline exists and the milestone finish date is the same as the baseline finish date, then the milestone is considered late if it is not completed and it was due before today’s date. In this case, days late is calculated as today’s date minus milestone finish date.

If there is no baseline, then days late is calculated if the milestone is not completed and it was due before today’s date. In this case, days late is calculated as today’s date minus milestone finish date.

The following fields are available for this portlet and you can add them through the configure option:

For more information, see the Personalizing CA Clarity PPM User Guide.

Start

Displays the milestone start date.

Baseline Start

Displays the milestone baseline start date.

Baseline Finish

Displays the milestone baseline finish date.

Days Late %

Displays days late as a percentage of the summary task or project timeframe, which is finish date minus start date. If the milestone has a parent task in the WBS, then the parent task timeframe is used in the calculation. If the milestone is at the top level of the WBS and does not have a parent task, then the project timeframe is used in the calculation. The calculation takes into account the milestone status and baseline (if one exists).

Schedule

Displays a stoplight indicating the number of days a milestone is late, considering the milestone status and whether or not a baseline exists for the milestone. The color of the stoplight indicates if the milestone is on schedule or late.

Stoplights:

Current Issues Portlet

The Current Issues portlet displays issues within the days outlook, grouped by priority across projects. Issues are not included in this portlet if their status is “Resolved” or “Closed”.

Data is displayed as a pie chart. Each pie segment reflects the number of issues by priority, giving an overall view of a project status in terms of issues raised. Click a pie slice to open the details of the issue on the Current Issues Drill Down page. The Current Issues Listing portlet on this page displays details about issues within the days outlook range.

More information:

Current Issues Drill Down Page

Current Issues Drill Down Page

The current issues drill down page includes the Current Issues Listing portlet. Use this portlet to assess the priority and schedule of the issues and decide on action plans to resolve them. Issues are not included in this portlet if their status is “Resolved” or “Closed”.

To view the current issues drill down page, click a pie slice in the Current Issues portlet.

The following columns display on the Current Issues Listing portlet:

Dashboard Icon

Displays an icon that links to the project dashboard.

Project

Displays the name of the project. Click a project name link to go to the properties page of the project.

Issue

Displays the name of the issue.

Description

Displays the description of the issue.

Priority

Displays a stoplight that indicates the priority of the issue.

Stoplights:

Schedule

Displays a stoplight for the schedule, which is a days late calculation. The schedule stoplight is calculated as today’s date minus the issue target resolution date. A positive number indicates that the issue target resolution date is late according to today’s date. A negative number indicates that it is early according to today’s date. The color of the stoplight indicates if the issue is on schedule or late.

Values:

Target Resolution

Displays the target resolution date of the issue.

Category

Displays the category assigned to the issue.

Values: Flexibility, Funding, Human Interface, Implementation, Interdependencies, Objectives, Organizational Culture, Resource Availability, Sponsorship, Supportability, or Technical.

Owner

Displays the name of the owner of the issue.

Email

Displays an email icon. Click this icon to send an email to the issue owner.

The following fields are available for this portlet and you can add them through the configure option:

For more information, see the Personalizing CA Clarity PPM User Guide.

Created By

Displays the name of the resource that created the issue.

Created Date

Displays the date when the issue was created.

Issue ID

Displays the Issue ID, which is the identifier of the issue.

Last Updated By

Displays the name of the resource who last updated the issue.

Last Updated Date

Displays the date when the issue was last updated.

Priority Name

Displays the priority as text instead of as a stoplight.

Values: High, Medium, Low

Resolution

Displays the final resolution of the issue.

Resolved Date

Displays the date when the issue was resolved.

Status

Displays the status of the issue.

More information:

Current Issues Portlet

Staffing Portlet

The Staffing portlet lets you identify projects where resources are not assigned to tasks within the days outlook. The portlet displays in a bar chart format the unstaffed ETC hours, which are hours assigned to a role instead of a resource. The Y-axis of the chart displays project names. The X-axis displays the number of hours assigned to roles instead of resources for each project.

Summary tasks and milestones are not included in this portlet. Also, tasks with a status of "Completed" are not included in this portlet.

The portlet helps you identify projects with tasks where resources are not assigned. You can analyze the results and replace roles with resources that can complete the work. Click a bar on the graph to go to the Staffing Outlook Drill Down page. The Staffing Details portlet displays on this page.

More information:

Staffing Outlook Drill Down Page

Staffing Outlook Drill Down Page

The Staffing Outlook Drill Down page includes the Staffing Details portlet. Use the portlet to view a list of unstaffed tasks for the selected project.

To view this portlet, click a bar on the chart on the Staffing portlet.

The Staffing Details portlet includes the following columns:

Dashboard Icon

Displays an icon that links to the project dashboard.

Project

Display the name of the project. Click a project name link to go to the properties page of the project.

Task

Displays the name of the task. Click a task name to view the task properties.

Team

Displays the Resources icon. Click the icon to go to the project team staff page and assign resources to the unstaffed roles.

Unstaffed Role

Displays the role name that is unstaffed. Click the role link to open the role properties page.

Assignment Start

Displays the start date of the assignment for the task.

Assignment Finish

Displays the finish date of the assignment for the task.

ETC

Displays the unstaffed ETC hours for the assignment.

Gantt Schedule

Displays a Gantt chart indicating when the assignment starts and finishes.

The following field is available for this portlet that you can add them through the configure option:

For more information, see the Personalizing CA Clarity PPM User Guide.

Project ID

Displays the Project ID, which is the identifier of the project.

Project Dashboard

The overview project dashboard page lists projects as a hierarchy. The hierarchy allows you to drill from a project through its work breakdown structure to the lowest level of resource assignments. The hierarchy also includes the ability to drill through subprojects. The dashboard provides more visibility and control into project governance through the use of project schedule, cost, and effort metrics.

For more information, see the Project Management User Guide.

This project dashboard overview page consists of the following portlets:

Follow these steps:

  1. Open Home, and from Personal, click General.

    The overview general page appears.

  2. Click Project Dashboard.

    The overview project dashboard page appears.

Use the page-level filter to filter all portlets at once by OBS and project manager.

More information:

Project Manager Cost and Effort Dashboard Portlet

Project Manager Schedule Dashboard Portlet

Project Manager Schedule Dashboard Portlet

The Project Manager Schedule Dashboard portlet displays project schedule performance and a Gantt. You can filter the results by the projects you manage or list all projects you have access to, including subprojects. Subprojects are always included under their master projects, but you can also display the subprojects in the top level of the portlet list. Displaying subprojects in the top level lets you filter on subprojects, using the filter options available in the portlet. For this reason, there is a Show Subprojects in List filter option of Yes that allows you to include Subprojects in the top level of the portlet list.

By default, this filter option is set to No, which means subprojects are not displayed in the top level of the portlet list.

The following fields display on the portlet:

Project/WBS/Resource

Displays the name of the project, WBS element, or resource. Click a Project/WBS/Resource link to open the properties page of the project, WBS element, or resource.

Subprojects Icon

Displays an icon that indicates the project is a subproject and links to the properties page of the subproject. The column heading is not displayed for this column to minimize the width.

Start

Displays the start date of the project, task, or assignment.

Finish

Displays the finish date of the project, task, or assignment.

Schedule %

Displays the following:

There is no calculation for resource assignments so the schedule % will display as a white stoplight.

Stoplights:

Days Late

Displays the number of days late considering the following:

If a baseline exists, then days late is calculated as project or task finish date minus baseline finish date. A positive number indicates that the project or task is late according to the baseline. A negative number indicates that it is early according to the baseline.

If a baseline exists and the project or task finish date is the same as the baseline finish date, then the project or task is considered late if it is not completed and it was due before today’s date. In this case, days late is calculated as today’s date minus project or task finish date.

If there is no baseline, then days late is calculated if the project or task is not completed and it was due before today’s date. In this case, days late is calculated as today’s date minus project or task finish date.

There is no calculation for resource assignments so the days late will not be populated.

Gantt Schedule

Displays a Gantt chart that shows the start and finish dates of the projects, subprojects, WBS elements, and assignments. The color of the Gantt bars is based on the schedule percentage as follows:

The Project Manager Schedule Dashboard and the Project Manager Cost and Effort Dashboard are based on the same query. Hence, you can configure fields from either portlet to appear on the other portlet.

For more information, see the Personalizing CA Clarity PPM User Guide.

In addition, the following fields are available for you to add through the configure option:

% Complete

Defines the percentage of work completed on the project or task.

Sources:

Baseline Start

Displays the baseline start date of the project, task, or assignment.

Baseline Finish

Displays the baseline finish date of the project, task, or assignment.

Charge Code

Displays the charge code of the project or task.

Sources:

Dashboard Icon

Displays a dashboard icon. Click the icon link to open the project dashboard.

Days Late %

Displays the following:

There is no calculation for resource assignments so the days late percentage will not be populated.

Schedule

Displays a stoplight indicating the number of days a project or task is late, considering the following:

The color of the stoplight indicates if the project or task is on schedule or late.

There is no calculation for resource assignments so the days late will not be populated.

Stoplights:

ETC

Displays the system-calculated value of the estimated effort to complete the project or task.

Sources:

ETC Cost

Displays the system-calculated value of estimate to complete, which is the predicted cost of finishing the remaining work.

Sources:

Open for Time Entry

Indicates if the project or task is open for time entry.

Project Manager

Displays the project manager of the project or subproject.

Project Progress or Task Status

Displays the project progress or task status.

Values: Not Started, Started, and Completed

More information:

PMO-Project Storyboard Page Layout

Project Manager Cost and Effort Dashboard Portlet

The Project Manager Cost and Effort Dashboard displays project cost and effort performance amounts and variances. You can filter the results by the projects you manage or list all projects you have access to, including subprojects. Subprojects are always included under their master projects, but you can also display the subprojects in the top level of the portlet list. Displaying subprojects in the top level lets you filter on subprojects, using the filter options available in the portlet. For this reason, there is a Show Subprojects in List filter option of Yes that allows you to include Subprojects in the top level of the portlet list.

By default, this filter is set to No, which means subprojects will not display in the top level of the portlet list.

Milestones do not have hours or cost so there are no values for milestones in this portlet.

The following fields display on the portlet:

Project/WBS/Resource

Displays the name of the project, WBS, or resource. Click a Project/WBS/Resource link to open the properties page of the project, WBS element, or resource.

Subprojects Icon

Displays an icon that indicates the project is a subproject and links to the properties page of the subproject. The column heading is not displayed for this column to minimize the width.

BAC Cost

Displays the system-calculated value of baseline at completion, which is the baseline cost at the time of the current baseline revision.

Sources:

Actual Cost (ACWP)

Displays the system-calculated value of actual cost of work performed (ACWP), which is the total direct cost incurred in performing work based on posted actuals.

Sources:

EAC Cost

Displays the system-calculated value of estimate at completion, which is the total cost of actual work completed to date and the predicted cost of finishing the remaining work.

Sources:

Projected Cost Variance

Displays the variance between the estimated plus actual cost and the baseline cost.

Source: Schedule & Performance properties page of the project.

Formula: ((ETC Cost + Actual Cost (ACWP)) - BAC Cost)

Projected Cost Variance %

Displays a stoplight indicating the projected cost variance as a percentage of BAC cost.

Source: Schedule & Performance properties page of the project.

Formula: (((ETC Cost + Actual Cost (ACWP)) - BAC Cost) / BAC Cost) * 100

Stoplights:

BAC

Displays the system-calculated value of the baseline effort (actuals plus remaining ETC) at the time of the current baseline revision.

Sources:

Actuals

Displays the system-calculated value of the actual effort posted for the task in the project.

Sources:

EAC

Displays the system-calculated value of the estimated effort at completion (actuals plus remaining ETC) of the project.

Sources:

Projected Effort Variance

Displays the variance between EAC effort and baseline effort.

Source: Schedule & Performance properties page of the project.

Formula: (EAC Effort – BAC Effort)

Projected Effort Variance %

Displays a stoplight indicating the projected effort variance as a percentage of BAC effort.

Source: Schedule & Performance properties page of the project.

Formula: ((EAC Effort – BAC Effort) / BAC Effort) * 100

Stoplights:

The Project Manager Schedule Dashboard and the Project Manager Cost and Effort Dashboard are based on the same query. Several fields are available for both of these portlets that you can add through the configure option. You can configure the fields from either portlet to appear on the other portlet. For the complete list of fields that you can configure, see the Project Manager Schedule Dashboard portlet description.

Issues and Risks

The overview issues and risks page provides a place to manage all the issues and risks you track in CA Clarity PPM.

This page includes the following portlets:

Follow these steps:

  1. Open the Home menu, and click General under Personal.

    The overview general page appears.

  2. Click Issues and Risks.

    The overview issues and risks page appears, with the Issue Management portlet maximized.

Use the page-level filter to filter both portlets at once by OBS and project manager.

More information:

Issue Management Portlet

Risk Management Portlet

Issue Management Portlet

The Issue Management portlet displays a list of issues associated to projects you have access to. The portlet has a default filter set to limit the issues to only the issues with a status of “Open” or “Work in Progress”.

The following fields display on the portlet:

Dashboard Icon

Displays an icon that links to the project dashboard.

Project

Displays the name of the project. Click a project name link to go to the properties page of the project.

Issue

Displays the name for the issue. Click an issue link to go to the issue properties page.

Description

Displays the description of the issue.

Priority

Displays a stoplight indicating the priority of an issue.

Stoplights:
Schedule

Displays a stoplight for the schedule, which is a days late calculation. The schedule stoplight is calculated as today’s date minus the issue target resolution date. A positive number indicates that the issue target resolution date is late according to today’s date. A negative number indicates that it is early according to today’s date. The color of the stoplight indicates if the issue is on schedule or late.

Values:

Target Resolution Date

Displays the target resolution date of the issue.

Category

Displays the category assigned to the issue.

Values: Flexibility, Funding, Human Interface, Implementation, Interdependencies, Objectives, Organizational Culture, Resource Availability, Sponsorship, Supportability, or Technical

Owner

Displays the name of the owner of this issue.

Email

Displays an email icon. Click the icon to send an email to the issue owner.

The following fields are available for this portlet and you can add them through the configure option:

For more information, see the Personalizing CA Clarity PPM User Guide.

Created By

Displays the name of the resource who created the issue.

Created Date

Displays the date when the issue was created.

Issue ID

Displays the Issue ID, which is the identifier of the issue.

Last Updated

Displays the date when the issue was last updated.

Project ID

Displays the Project ID, which is the identifier of the project.

Resolution

Displays the final resolution details of the issue.

Resolved Date

Displays the date when the issue was resolved.

Status

Displays the status of the issue.

Updated By

Displays the name of the resource who last updated the issue.

Risk Management Portlet

The Risk Management portlet displays a list of risks associated with projects to which you have access. The portlet has a default filter set to limit the risks to only the risks with a status of "Open" or "Work in Progress".

The following fields display on the portlet:

Dashboard Icon

Displays an icon that links to the project dashboard.

Project

Displays the name of the project. Click a project name link to go to the properties page of the project.

Risk

Displays the name of the risk. Click a risk link to go to the risk properties page.

Description

Displays the description of the risk.

Priority

Displays a stoplight indicating the priority of the risk.

Stoplights:
Probability

Displays a stoplight indicating the probability of the risk occurrence.

Values:
Impact

Displays a stoplight indicating the risk impact.

Values:
Above Threshold

Displays a checkmark indicating that the calculated risk is greater than the system-level overall risk threshold. The CA Clarity PPM administrator defines the system-level overall risk threshold in the project management risk settings.

One of two indicators appear in the column:

Target Resolution Date

Displays the target resolution date of the risk.

Category

Displays the category assigned to the risk.

Values: Flexibility, Funding, Human Interface, Implementation, Interdependencies, Objectives, Organizational Culture, Resource Availability, Sponsorship, Supportability, or Technical.

Owner

Displays the name of the owner of the risk.

Email

Displays an email icon. Click this icon to send an email to the risk owner.

The following fields are available for this portlet and you can add them through the configure option:

For more information, see the Personalizing CA Clarity PPM User Guide.

Assumptions

Defines the assumptions in determining that this item is a risk. You can verify these assumptions to help ensure that they stay valid though the life of the risk. If the assumptions change, the impact or probability of the risk may also change.

Calculated Risk

Displays the score calculated based on the selections you make in the Probability and Impact fields on the risk properties.

Date Last Updated

Displays the date when the risk was last updated.

Impact Date

Defines the date by which repercussions from this risk can start affecting the project.

Impact Description

Defines the impact the risk has on the project.

Project ID

Displays the project ID, which is the identifier of the project.

Resolution

Displays the final resolution of the risk.

Resolved Date

Displays the date when the risk was resolved.

Response Type

Defines the type of response you want to make with this risk.

Risk ID

Displays the Risk ID, which is the identifier of the risk.

Risk Symptoms

Defines the symptoms that identify this item as a risk.

Status

Displays the risk status.

Updated By

Displays the name of the resource who last updated the risk.