Pausing scheduled report runs temporarily stops the report from running. When in this state, the report cannot run at its scheduled time until you resume the report run. When you resume the report runs, it runs at its next scheduled run time. You can pause reports that have a "Scheduled" status.
Follow these steps:
The list page appears.
The scheduled reports page appears.
The status of the report run changes to "Paused".
The status of the report run changes to "Scheduled". The report runs at the next scheduled time.
Copyright © 2012 CA. All rights reserved. |
|