Dashboards and Portlets

This section contains the following topics:

Gate Scoring

Executive Dashboard

Portfolio Management Dashboard

Idea Management Dashboard Overview

Stage Review

Portfolio Master Page Layouts

Gate Scoring

The Gate Scoring dashboard is built for product managers and marketing managers who need to see the gate scores for all ideas and projects in one location.

Gate Scoring List

The Gate Scoring List is a snapshot portlet designed to show metrics for projects or ideas.

The following columns are displayed on this portlet:

Gatekeeper

Defines the name of the gatekeeper. Click the name to open the Resource Properties page.

Properties Icon

Click the icon to view the Gate Scoring Properties page.

Project or Idea

Defines the name of the idea or project. Click the name to open the Idea Properties page (main) or the Project Properties page.

Stage

Defines the current stage of the idea or project.

Score Date

Defines the date when the gate score was completed.

Gate Score

Defines the stoplight icon and gate score number (from the project or idea gate score field).

Potential Market Gain

The standard stoplight.

Product & Competitive Advantage
Reward to Company
Strategic Fit and Importance
Synergies - Leverage Core Competencies
Technical Feasibility
Market Attractiveness

The following portlet filters are available:

Gatekeeper(s)

Click the browse icon to filter by resources who have been assigned as gatekeepers.

Gate Score

Enter a range to filter by the gate score.

Project or Idea

Click the browse icon to filter by project or idea.

Stage

Click the browse icon to filter by stage.

Executive Dashboard

The Executive Dashboard is built for those individuals that must have a view across all projects, products, and their respective portfolios. It includes five tabs, each containing portlets for R & D, Launch, and Brand tracking. Perhaps most critical of these is the Roadmap tab, which shows where products are in their product lifecycle so executives can plan for the future.

Executive Dashboard Overview

The Overview tab contains three portlets that provide general information for an executive.

To view these portlets, click Executive Dashboard in the New Product Development menu. The Overview tab is displayed by default.

Gate Review

The Gate Review portlet shows all the submitted ideas and active projects currently moving through the gating process. For ideas, this process is the idea screen process before an idea is converted to a project. For projects, the gating process runs throughout the life of the project. As each gating milestone is completed, the project goes through a gate review for approval to move on to the next stage. The Gate Review portlet provides you with insight into the number of ideas and projects going through approval processes.

The following columns are displayed on this portlet:

Gatekeeper

The name of the gatekeeper. Click on the name to drill down to the Resource Properties page.

Properties Icon

Click on the icon to view the Gate Scoring Properties page.

Project or Idea

The name of the idea or project. Click the name to drill down to the Idea Properties page (main) or the Project Properties page.

Stage

The current stage of the idea or project.

Score Date

The date when the gate score was completed.

Gate Score

The stoplight icon and gate score number (from the project or idea gate score field).

The following portlet filters are available:

Gatekeeper

Click the browse icon to filter by resources who have been assigned as gatekeepers.

Investment

Click the browse icon to filter by investment.

Project Update

The Project Update portlet lets you filter to display a specific set of projects. It shows key metrics about gate scores and decisions and cost and revenue information. By default, this portlet is sorted with red flag projects at the top.

The following columns are displayed on this portlet:

Project

The name of the project. Click on the name to drill down to the Project Properties page.

Properties icon

Click on the icon to drill down to the Project Hierarchy page.

Gate Score

The stoplight icon and gate score number (from the project or idea gate score field).

Gate Decision

The current gate decision represented by a colored, directional arrow.

Red Flag

The red flag Boolean on the project.

Stage

The current stage of the project.

Customer Market

The customer market selection on the project.

Product Category

The selected product category on the project.

Ranking

An attribute on the project that allows selection of a number between 1 and 10 to rank projects in order from most to least important.

Planned Revenue

Total planned revenue for the project.

Planned Cost

Total planned cost for the project.

Actual Cost

Total actual cost for the project.

Remaining Cost

The difference between actual cost and planned cost.

Planned ROI

ROI percentage from the project.

Planned NPV

NPV percentage from the project.

The following portlet filters are available:

Product Category

Select a category from the drop down list.

Product Line

Select a product line from the drop down list.

Gate Decision

Select a gate decision from the drop down list.

Brand

Select a product brand from the drop down list.

Customer Market

Select a customer market from the drop down list.

Customer Segment

Select a customer market from the drop down list.

My Action Items

The My Action Items portlet displays all the notifications and scheduled action items that a marketing, process, or product manager receives.

The following columns are displayed on this portlet:

Action Item

The name of the action item. Click on the action item to drill down to the Action Item Details page.

Priority

Based on high, medium, or low priority with corresponding red, yellow, or green stoplights.

Status

Displays the status.

Values: Open, Closed, Deferred, Done, and In Progress

Date Received

The date that the action item was assigned to the user.

Process Icon

Click on the icon to drill down to the Process Diagram page.

The following portlet filters are available:

Status

Specifies the status.

Brand Dashboard Tab

The Brand Dashboard tab contains three portlets that provide general information for executive or senior managers.

Brand Portfolios

The Brand Portfolios portlet is designed to select only the portfolios that have the Brand Portfolio checkbox selected. It allows portfolio analysts to view specific product brands and their overall costs and revenues. From an executive standpoint it shows which brands are performing well.

The following columns are displayed on this portlet:

Brand

Displays the portfolio name. Click on the name to drill down to the Portfolio Scorecard page.

Product Category

This is the product category from the portfolio.

Planned Cost

The total planned cost of the portfolio.

Planned Benefit

The total planned benefit of the portfolio.

Variance

The difference of cost subtracted from benefit.

Portfolio Revenue and Cost per Year

The Portfolio Revenue and Cost per Year portlet is a stacked column portlet that displays costs and revenues per portfolio. It allows you to select a collection of portfolios to compare numbers across them. This portlet uses a yearly time measurement, so all monetary amounts for the portfolio will be based on the year selected. You can also select all years and get the view from the beginning of tracking this data in CA Clarity PPM Accelerator for NPD.

Costs and revenues must be entered on each project in the portfolio for this portlet to display data. Each stacked column contains a blue and red portion for revenue and cost respectively.

The following portlet filters are available:

Portfolio

Click the multi-select browse icon to pick one or more projects for display in the portlet.

Year

Select a year from the drop down list. Select All to view all of the portfolios.

Product Line Rating

The Product Line Rating portlet makes it easy to determine how well each product area is doing. The bubble chart displays the aggregate of all the products based on their category. It compares the metrics for the competition rating on the X axis and the Product Potential Gain on the Y axis.

The legend lists each of the following attributes along with the colors:

X Axis

Competition Rating - this is the attribute of the same name on the product.

Y Axis

Product Potential Gain - this is the attribute of the same name on the product.

Bubble Color

The bubble color represents the product category.

Bubble Size

Average Market Share - this is a percentage attribute from the product. For this percentage, the products in the specific product category are added together and averaged.

The following portlet filter is available:

Product Category

This is the product category from the portfolio.

Roadmap Tab

The Roadmap tab contains the Roadmap portlet that provides an executive view of future and current projects. You can iew groups of projects and products to determine the direction for various product lines. Roadmapping refers to that kind of capability. The Roadmap portlet provides the metrics for executives and analysts to plan out product futures. This portlet shows both projects and products, which has different stages based on where they are in the product lifecycle. The Roadmap portlet provides baselined data only, including baseline effort and cost as compared to actuals. Drill down to review project or product dependencies and their hierarchies.

The following columns are displayed on this portlet:

Product Line/Investment

The product line that the project or product belongs to (parent) or the name of the project or product (child). Click the + sign to view the projects or products assigned to the product line. Click the item to open the project or product Properties page.

Dependencies Icon

Click the icon to open the project or product Dependencies page.

Hierarchy Icon

Click the icon to open the Project Hierarchy page.

Lifecycle Phase

The current stage of the project or product.

Status

The project or product status indicator.

Baseline Effort

The baseline number of hours on the project or product.

Baseline Cost

The total planned cost for the project or product.

Actual Effort

The actual number of baseline hours on the project or product.

Actual Cost

The total actual cost for the project or product.

The following portlet filter is available:

Product Line(s)

Click the Browse icon to filter by the product line from the investment.

Launch Dashboard Tab

The Launch Dashboard Tab contains two portlets that provide information specific to projects that are about to launch new products.

Launch Performance by Brand

The Launch Performance by Brand portlet is designed to show the percentage of project launches that are on time. It compares each brand according to a time scale of being delivered early, on time, 30 days late, or more than 30 days late. It combines all the projects in one brand and uses the difference between project completion date and project launch date to determine where the launch falls on the time scale.

The following portlet filters are available:

Brand

Click the multi-select browse icon to pick one or more brands for display in the portlet.

Year

Select a year from the drop down list. Select All to view all of the portfolios.

Expected Product Launches By Product Line

For future planning, this portlet displays upcoming launches sorted by product line and distributed per year. This is very useful for planning purposes to see if one product line is favored over another and to think about how launches will affect the market place.

The following portlet filters are available:

Year

Select a year from the drop down list. Select All to view all of the products.

Product Line

Click the multi-select browse icon to pick one or more of the product lines for display in the portlet.

R&D Dashboard Tab

The R&D Dashboard Tab contains twos portlets that provide information specific to projects and portfolios under development.

Life-Cycle Funnel

The Life-Cycle Funnel portlet shows all the projects dispersed throughout the five stages for NPD. This portlet is designed to convey the number of projects per stage. Using this portlet, executives and product development can get an idea of what they must prepare for in upcoming months.

The funnel slices represent each project stage, starting with Idea Screen, Scoping, Business Case, Development, Test and Validate, and then Launch. This portlet displays the project stage name and the number of projects in that stage.

The following portlet filters are available:

Portfolio

Click the browse icon to select a portfolio for display in the portlet.

Status

Defines the portfolio investment status for display in the portlet.

Values:

Strategic Planning Cost Analysis

The Strategic Planning Cost Analysis portlet shows executives and development management how much they are spending per stage on one or more projects. You can select the project(s) from the portlet filter as well as the fiscal time period you want to use.

The following portlet filters are available:

Product Category

Select a category from the drop down list.

Project(s)

Click the multi-select browse icon to pick one or more projects for display in the portlet.

Period Type

Required. Select a period type (e.g., Monthly or Quarterly) from the drop down list.

Period

Select a specific fiscal time period from the drop down list.

Portfolio Management Dashboard

The Portfolio Management Dashboard provides project portfolio managers with a collection of portlets that show metrics specific to idea, project, and product portfolios.

Portfolio Management Overview

The Overview tab contains three portlets that provide the project portfolio manager with metrics specific to the idea, project, and the product portfolios:

To view these portlets, click Portfolio Management Dashboard in the New Product Development menu. The Overview tab is displayed by default.

The Gate Review and My Action Items portlets display identical functionality to the portlets found in the Executive Dashboard.

My Projects

The My Projects portlet shows all the projects currently moving through the gating process.

The following columns are displayed on this portlet:

Project

The name of the project. Click on the name to drill down to the Project Properties page.

Current Stage

The current stage of the project.

Team

Click the Detailed Resource Information icon to drill down to the Project: Team: Detail page.

Tasks

A list of the tasks completed or currently running for the project. Click the icon to drill down to the Project: Tasks: Work Breakdown Structure page.

Documents

Click the Document Manager icon to drill down to the Project Document Manager page.

Stage Review

Click the icon to drill down to the Stage Review portlet.

The following portlet filters are available:

Project Name

Enter a name to search by project.

Project Manager

Select a manager from the drop down list.

Project ID

Enter an ID to filter by project ID.

Active

Select a project status from the drop down list (All, Yes, or No).

Pipeline Planning Tab

The Pipeline Planning tab contains three portlets that display portfolio and project metrics.

Projects in Development

The Projects in Development portlet provides a portfolio manager with an understanding of upcoming project loads based on stages.

It is a bubble chart designed to provide a view of a group of projects based on their current stage and costs. The background colors represent each stage and the bubble colors represent gate decisions. The size of the bubble indicates how high the gate score was (the larger the bubble, higher the score).

My Portfolios

My Portfolios is a snapshot portlet designed to show metrics for just the portfolios that you have access to view, based on your role.

The following columns are displayed on this portlet:

Portfolio

The name of the portfolio.

Budgeted Benefit

The planned benefit field on the portfolio.

Budgeted Cost

The planned cost field on the portfolio.

Cost Variance

The variance subtracting cost from benefit.

Stoplight Icon

There is no filtering available because of the nature of the portlet.

Prioritized Scored List of Projects

Prioritized Scored List of Projects is a snapshot portlet designed to show metrics for just the portfolios that you have access to view, based on your role. There is no filtering available because of its nature, displaying the portfolios the user can view.

The following columns are displayed on this portlet:

Project

The name of the project. Click on the name to drill down to the Project Details page.

Stage

The current stage on the project.

Gate Score

The stoplight icon and gate score number (from the idea gate score field).

Gate Decision

The current gate decision represented by a colored, directional arrow.

Manager

The user assigned to manage the project.

Strategic Fit and Importance

The standard stoplight.

Product and Competitive Advantage

The standard stoplight.

Potential Market Gain

The standard stoplight.

Synergies - Leverage Core Competencies

The standard stoplight.

Technical Feasibility

The standard stoplight.

Reward to Company

The standard stoplight.

The following portlet filters are available:

OBS Unit

Click the browse icon to filter by OBS unit.

Manager

Click the browse icon to filter by project manager resource name.

Stage

Click the browse icon to filter by project stage.

Gate Decision

Select an option from the drop down list to filter by gate decision (Go, Hold, Kill, or Recycle).

Portfolio Metrics Tab

The Portfolio Metrics Tab contains two portlets that display data about Portfolios.

Portfolio Revenue and Cost

Portfolio Revenue and Cost is a column chart portlet that compares displays cost and revenue per portfolio. It is a side-by-side display for comparison purposes. This is based on the total revenues and total cost for the portfolio it is not time-based.

The following portlet filter is available:

Portfolio

Click the multi-select lookup icon to pick one or more portfolios for display in the portlet.

Master Portfolios

Master Portfolios is a snapshot portlet designed to display hierarchies of portfolios. A parent portfolio can be selected and different configurations of the children portfolios can be selected.

The following columns are displayed on this portlet:

Portfolio

Displays the portfolio name. Click on the name to drill down to the Portfolio Scorecard page.

Portfolio Planned Cost

The planned cost of the portfolio.

Investments Planned Cost

The planned cost value of all investments in the portfolio.

Cost Variance

Displays the variance subtracting the total cost of investments from the portfolio planned cost.

Variance Stoplight

Displays the variance from the planned costs.

Portfolio Planned Revenue

Total planned revenue for the portfolio.

The following portlet filters are available:

Portfolio

Click the browse icon to filter by portfolio name.

Parent Portfolio

Click the browse icon to refine the filter to search by parent portfolio name.

Idea Management Dashboard Overview

The Idea Management Overview tab provides general information for a marketing or product manager. The following portlets are displayed on this page:

Ideas

The Ideas portlet provides the means to create new ideas. The only functionality in this portlet is the New button, which links to the Create Idea page.

Idea Gate Review

The Idea Gate Review portlet is similar to the Gate Review portlet except it displays more information specific to ideas. This portlet shows all the submitted ideas that are currently going through the screening (gating) process, providing quick updates to marketing and product managers as they gauge where ideas are in the approval process.

The following columns are displayed on this portlet:

Gatekeeper

The name of the gatekeeper. Click on the name to drill down to the Resource Properties page.

Properties Icon

Click on the icon to view the Gate Scoring Properties page.

Idea

The name of the idea. Click on the name to drill down to the Idea Properties page.

Stage

The current stage of the idea.

Score Date

The date when the gate score was completed.

Gate Score

The stoplight icon and gate score number (from the idea gate score field).

Idea Comparison

Click on the icon to drill down to the Idea Comparison page.

The following portlet filters are available:

Gatekeeper

Click the browse icon to filter by resources who have been assigned as Gatekeepers.

Stage

Click the browse icon to filter by stage.

Score Date

Select a date range to filter by the score date.

Idea

Click the browse icon to filter by stage.

Manager

Click the browse icon to filter by resources who have been assigned as managers.

Status

Select an idea status from the drop down list (All, Approved, Unapproved).

My Action Items

The My Action Items portlet displays all the notifications and scheduled action items that a marketing, process, or product manager receives.

The following columns are displayed on this portlet:

Action Item

The name of the action item. Click on the action item to drill down to the Action Item Details page.

Priority

Based on high, medium, or low priority with corresponding red, yellow, or green stoplights.

Status

Displays the status.

Values: Open, Closed, Deferred, Done, and In Progress

Date Received

The date that the action item was assigned to the user.

Process Icon

Click on the icon to drill down to the Process Diagram page.

The following portlet filter is available:

Status

Select an action item status from the drop down list.

Idea Processes

The Idea Processes portlet quickly updates a product or marketing manager as to the current ideas moving through approval process. You can click the process icon to see the idea's progress and drill down to the Idea Properties page.

The following columns are displayed on this portlet:

Idea

The name of the idea. Click on the name to drill down to the Idea Properties page.

Status

The status of the idea: Aborted, Aborting, Done, Error, Running

Start Date

The date that the process was initiated.

End Date

The date that the process was marked as Done.

The following portlet filters are available:

Idea Requester

Click the browse icon to select an individual resource and display only their ideas in the portlet.

Status

Select a status from the drop down list.

Start Date

Select the date to filter by the process start date.

Stage Review

The Stage Review Dashboard provides project managers with access to all the pertinent areas they need to review before submitting an idea or project for approval to move on to the next stage. The page level filtering allows you to select a project and a stage so you only see one stage across all the portlets.

Resource Review Tab

The Resource Review tab contains one portlet that provides the project manager with general resource information.

To view this portlet, click Stage Review in the New Product Development menu, and click the Resource Review tab.

Resource Utilization

The Resource Utilization portlet contains a complete listing of all the resources that have been assigned to the project. It displays allocations and assignments and the variance between them. A time period can be selected, based on the company-entered time periods, for display of the resource data. The data repeats for each time period and this is displayed by using two header rows: one for the time periods and one for the column names.

For data to appear in this portlet, you need to have resources allocated to the project and assigned to tasks on the project.

The following columns are displayed on this portlet:

Resource

Displays the name of the resource (last name, first name) associated to the specific issue. Click on the resource name to drill down to the resource/role allocations page.

Allocation

The number of hours the resource is allocated to the selected project

Assignment

The number of hours the resource is assigned to the selected project

Variance

The difference between Allocation minus Assignment. If there is a negative number then the user is under-allocated; if there is a positive number then the user is over-allocated

These four columns will repeat with each time period. The time periods are displayed in a row above the column headers.

The following portlet filters are available:

Project

Type in the project name to search by project.

Stage

Click the browse icon to filter by stage; only the resources that have been assigned to tasks in that stage will be displayed.

Resources Only?

Select an option from the drop down list (All, No, Yes).

Manager

Click the browse icon to filter by manager name.

Period Type

Select a period type from the drop down list.

Document Review Tab

The Document Review tab contains four portlets that show documents from the document manager repository in different views.

To view these portlets, click Stage Review in the New Product Development menu, and click the Document Review tab.

By default, only the All Documents portlet is displayed. The remaining three portlets can be viewed by selecting them from the drop-down list.

All Documents

The All Documents portlet is a complete listing of all the documents that have been uploaded to the project. It displays information about the project schedule, due dates, and categories and provides a link to drill down to the document itself. It is designed for project managers to get the big picture of all the documents currently available for the project.

The following columns are displayed on this portlet:

Document Manager Icon

This is the link to the document manager to view the entire folder structure and documents. Click on the document name to drill down to the Collaboration - project document manager page.

Document

This is the name of the document and also serves as a link to open the document. Click on the document name to open the document.

Status

The status of the document. The options are tied to standard stoplights:

Schedule

The schedule is based on the completion date for the task (phase) that the document is associated with. All documents for a phase should be finished by the end date of that phase.

Due Date

Displays the finish date on the milestone task that matches the documents folder.

Stage

The document folder. Each of the folders represent a project stage and are labeled with the same names as the project stages.

Important! Each folder is linked to the phase part of the WBS (e.g., Scoping, Business Case, or Development). It is important that you do not change the names of these folders and phases, otherwise the document review portlets will not work correctly. If you must change the folder and phase names, than you will need to modify all the document review portlets with the new names.

Category

This is the document category that is assigned to a document when it is uploaded to the repository. It can be one of the following: Proposal, Planning, Development, Implementation, Operations.

Owner

The individual that uploaded the document. Click on the owner name to drill down to the Resource Properties page.

Last Updated Date

The date when the most recent version was uploaded to the repository

Last Revision Comments

The comments list from the latest version that was uploaded to the repository

The following portlet filters are available:

OBS

Filter by Standard Organizational Breakdown Structures (OBS).

Project

Filter by project.

Stage

Filter by stage; based on the stage values for NPD.

Manager

Filter by manager.

Status

Filter by project status (approved or unapproved).

Document Category

The document categories of Proposal, Planning, Development, Implementation, Operations.

Document Status

Filter by status (Approved, Rejected, Submitted).

Document Schedule

This is a lookup with two choices: All, for all the documents and Late, for the ones that are late in relation to the milestone task finish date.

Document Owner

Filter by the user who uploaded the document.

Document Name

A free entry text field to type in the document name or part of the document name using wildcards.

Document Due Date

A date range filter to retrieve those documents that have due dates between the entered dates.

Deliverables

The Deliverables portlet is identical to the All Documents portlet except that it limits the display to the documents that are in a Deliverables folder in the document repository.

Gate Documents

The Gate Documents portlet is identical to the All Documents portlet except that it limits the display to the documents that are in the Gate Documents folder in the document repository.

Worksheets

The Worksheets portlet is identical to the All Documents portlet except that it limits the display to the documents that are in the Worksheets folder in the document repository.

Idea Management Dashboard

The Idea Management Dashboard is built for product managers and marketing managers who need access to idea metrics as they push ideas through the approval process.

Idea Vault Tab

The Idea Vault tab provides a complete listing of all the ideas that have been entered and general idea information for a marketing or product manager. It includes a built-in power filter to automatically include all ideas that have gone through the idea scoring process. The Idea Vault provides a view of all reviewed ideas and the ability to create 'what if' scenarios to finalize product portfolio plans.

Use this portlet to filter by gate decision in order to determine the number of ideas that have been converted to projects, put on hold, or killed. It shows the key gate factors and gate decision, and the ability to drill down to the idea properties for more details.

Kill and Hold ideas are maintained in the Idea Vault so they can be reviewed for future consideration at any time. Only ideas that have gone through the scoring/screening process are maintained in the Idea Vault.

To view this portlet, click Idea Management Dashboard in the New Product Development menu, and click the Idea Vault tab.

The following columns are displayed on this portlet:

Idea

The name of the idea. Click on the name to drill down to the Idea Properties page.

Gate Score

The stoplight icon and gate score number (from the idea gate score field).

Gate Decision

The current gate decision represented by a colored, directional arrow.

Strategic Fit and Importance

The red/yellow/green stoplight.

Product and Competitive Advantage

The red/yellow/green stoplight.

Market Attractiveness

The red/yellow/green stoplight.

Reward to Company

The red/yellow/green stoplight.

Synergies - Leverage Core Competencies

The red/yellow/green stoplight.

Technical Feasibility

The red/yellow/green stoplight.

Customer Market

The customer market value taken from the investment attribute.

Customer Segment

The customer segment value taken from the investment attribute.

The following portlet filters are available:

Product Category

The selected product category on the idea.

Product Line

Select a product line from the drop down list.

Product Type

Select a type to filter by the kind of product.

Brand

The idea brand.

Strategy

Select an idea strategy from the drop down list

Customer Market

Select a market from the drop down list

Customer Segment

Select a segment from the drop down list

Gate Decision

Click the multi-select browse icon to filter by a combination of decisions.

Idea Financials Tab

The Idea Financials tab contains one portlet that displays financial data about Ideas.

To view this portlet, click Idea Management Dashboard in the New Product Development menu, and click the Idea Financials tab.

Idea Revenue and Cost

The Idea Revenue and Cost portlet provides a view of the potential dollars made and dollars spent for all ideas. It displays two columns for each idea: the red column represents the costs and the blue column represents the revenue.

The following portlet filters are available:

Product Category

This is the product category from the idea.

Product Line

Select a product line from the drop down list.

Strategy

Select a strategy from the drop down list.

Customer Market

Select a customer market from the drop down list.

Customer Segment

Select a customer market from the drop down list.

Gate Decision

Select a decision filter from the drop down list.

Financial Review Tab

The Financial Review Tab contains one portlet that displays different levels of the project's cost and benefit plans.

To view this portlet, click Stage Review in the New Product Development menu, and click the Financial Review tab.

Financial Plan vs Actual Review

The Financial Plan vs Actual Review portlet is a complete listing of all the documents that have been uploaded to the project. It shows planned and actual costs and benefits and the variance between them. The information is available at each cost plan detail level in a hierarchical display.

The first level is the Investment, the second level is the Cost Plan and Benefit Plan, and the third level and down are the detail rows on the cost and benefit plans.

The following columns are displayed on this portlet:

Investment/Plan Detail

Displays the name of the investment and the name of the cost and benefit plans. Click the investment name to open the Project Properties page.

Planned

Displays the planned cost or planned benefit number depending on the row.

Actual

Displays the actual cost or actual benefit number depending on the row.

Variance

The difference between Planned minus Actual. For costs, a negative number means more money has been spent than was planned. If there is a positive number, then less money has been spent than planned. For benefits, a negative number signals the revenues were greater than anticipated. If there is a positive number then the revenues were less than anticipated.

The following portlet filters are available:

Project

Click the browse icon to filter by project.

Period Type

Select a period type from the drop down list.

Period Start

Select the date based on the start date for the time period.

Period End

Select the date based on the end date for the time period.

Schedule Review Tab

The Schedule Review Tab contains one portlet that displays the project's work breakdown schedule.

To view this portlet, click Stage Review in the New Product Development menu, and click the Schedule Review tab.

Master Schedule

The Master Schedule portlet is a complete listing of tasks in the WBS. It includes task metrics such as ETC, baseline cost, actual costs, finish date, days late, and several others. This is the place where the project manager can confirm that all the tasks for a specific gate have been completed and when ready, the project manager can drill down to the specific gate milestone and submit for the approval to move on to the next gate.

The following columns are displayed on this portlet:

Project/WBS/Resource

This is the name of the project, the name of the task, or the name of the resource, depending on the level expanded in the hierarchy. Click on the project name to drill down to the Project Properties page, the Task Properties page, or the Resource Properties page.

Finish

This is the finish date for the task.

Days Late

This is the calculated number of days late.

ETC

This is the number of ETCs on the task.

ETC Cost

This is the monetary amount of ETCs on the task.

Baseline Cost

This is a monetary amount for the baseline cost. The project must be baselined in order to get this data.

Actual

This is the actual hours for the task.

Actual Cost

This is a monetary amount for the actual cost. The project must be baselined in order to get this data and there must be timesheets submitted, approved, and posted.

EAC Cost

This is a monetary amount for the EAC cost. The project must be baselined in order to get this data.

Gantt

Defaults to a monthly display. It will list the months across the top and display a colored bar to mark progress of the task.

The following portlet filters are available:

Project

Click the browse icon to filter by project.

Stage

Click the browse icon to filter by stage.

Project Manager

This is the project manager from the project object.

Status

Select a project status from the drop down list (Approved or Unapproved).

Critical Issue Review Tab

The Critical Issue Review Tab contains one portlet that displays all the issues from the project (not risks or change requests).

To view this portlet, click Stage Review in the New Product Development menu, and click the Critical Issue Review tab.

Project Issue Review

The Project Issue Review portlet displays all of the issues for a project. It includes the description and stoplight displays for schedule and priority. The project manager can check on resolution dates and drill down to further view specific issues.

The following columns are displayed on this portlet:

Schedule

This is the red/yellow/green stoplight based on the target resolution date and the number of days before or after it before the issue is marked as resolved. This is an attribute created with the NSQL query for this portlet:

Priority

This is the red/yellow/green stoplight based on the priority for the issue. This is an attribute created with the NSQL query for this portlet:

Issue ID

This is the issue's ID number. Click on the ID number to drill down to the Issue Properties page.

Issue Description

This is the description of the issue. Click on the description to drill down to the Issue Properties page.

Category

This is the issue category name.

Owner

This is the owner for the issue, displayed as last name, first name. Click on the owner name to drill down to the Resource Properties page.

Email Icon

This is a link to send an email to the owner. Click on the icon to send an email to the project owner.

Target Resolution Date

This is the target resolution date on the issue.

The following portlet filters are available:

OBS

Filter by Standard Organizational Breakdown Structures (OBS).

Project

Click the browse icon to filter by project.

Issue Category

Click the browse icon to filter by the issue category.

Issue Priority

Select a priority from the drop down list.

Issue Status

Select a status from the drop down list.

Target Resolution Date

Select a date range to look for issues between dates.

Portfolio Master Page Layouts

Portfolios allow managers to group and view their investments together. CA Clarity PPM Accelerator for NPD has two portfolio portlets that allow project and product managers to create scenarios when they build out portfolios and compare changes in schedule, cost, and resources from a scenario, with their current plan of record.

The Product Master Portfolio page layout is a set of tabs and portlets that can be selected as the layout when viewing a portfolio. It is designed to work with product portfolios where an organization is tracking specific product lines or brands.

The Project Master Portfolio page layout supports the NPD metrics for projects. It includes portlets to assist with future project planning and reviewing of costs and revenues.

Note: See the Portfolio Management User Guide for more information on managing portfolios.

Product Master Portfolio Page Layout

Costs and revenues can be tracked using existing CA Clarity PPM functionality. The Product Master Portfolio is available to populate with all products or a sub-set of products. Product Managers will want to track groups of products according to product line and brand, and these can be built with the power-filter in Portfolios.

The Product Master Portfolio page layout is available with several comparison portlets so that you can compare the current plan of record with different scenarios. Competitor information can be tracked for products and used to create competitor portfolios for use in product planning.

Market Analysis Tab

The Market Analysis tab contains four portlets that provide general information for a marketing or product manager.

To view these portlets, click Portfolios in the Portfolio Management menu. Click the NPD Product Master link and then click the Market Analysis tab.

Product Market Growth (plan of record)

The Product Market Growth (plan of record) portlet is a bubble chart that displays individual products based on their product category (e.g., new to world or new to company). It displays the current plan of record for a product portfolio (the portfolio must have products in it for this bubble chart to work).

It compares some of the metrics for the product price trend on the X axis and the product market projections on the Y axis. As an example, this portlet provides a view of which products have stronger price points and higher market gains versus products that may have good market gain but weak price points. There are several other comparisons that can be made with this portlet's data.

The legend lists each of the following attributes along with the colors:

X Axis

Product Price Position.

Y Axis

Market Growth Projection.

Bubble Color

The bubble color represents the product category.

Bubble Size

Market Attractiveness

The following portlet filters are available:

OBS Unit

Click the browse icon to filter by OBS unit.

OBS Unit Filter Mode

Select a filter mode from the drop down list.

Product Market Growth

The Product Market Growth bubble chart is very similar to the Product Market Growth (plan of record) portlet. It also displays individual products based on their product category, but now these are based on a selected scenario, rather than the plan of record.

The legend lists each of the following attributes along with the colors:

X Axis

Product Price Position (Calculated).

Y Axis

Market Growth Projection (Calculated).

Bubble Color

The bubble color represents the product category.

Bubble Size

The bubble size represents the market share.

The following portlet filters are available:

OBS Unit

Click the browse icon to filter by OBS unit.

OBS Unit Filter Mode

Select a filter mode from the drop down list.

Product Financials (plan of record)

The following columns are displayed on this portlet:

Product

The product name. Click on the name to drill down to the Product Properties page.

Grid with Plus (Add to Scenario) Icon

Click the icon to drill down to the Create Scenarios page.

Product Category

The selected product category on the project.

Planned Revenue

Total planned revenue for the project.

Planned Cost

Total planned cost for the project.

Actual Cost

Total actual cost for the project.

Remaining Cost

The difference between actual cost and planned cost.

Planned NPV

NPV percentage from the project.

Planned ROI

ROI percentage from the project.

Planned Breakeven

Displays the date and amount to indicate the period and value at which the program becomes profitable.

The following portlet filters are available:

Planned NPV

NPV percentage from the project.

Planned ROI

ROI percentage from the project.

Product Financials

The following columns are displayed on this portlet:

Name

The product name. Click on the name to drill down to the Product Properties page.

Grid with Plus (Add to Scenario) Icon

Click the icon to drill down to the Create Scenarios page.

Product Type

The selected product type on the project.

Planned Benefit --

The total planned benefit of the portfolio.

Planned Cost

Total planned cost for the project.

Actual Cost

Total actual cost for the project.

Remaining Cost

The difference between actual cost and planned cost.

Planned NPV

NPV percentage from the project.

Planned ROI

ROI percentage from the project.

Planned Breakeven

Displays the date and amount to indicate the period and value at which the program becomes profitable.

The following portlet filters are available:

OBS Unit

Click the browse icon to filter by OBS unit.

OBS Unit Filter Mode

Select a filter mode from the drop down list.

Competitive Analysis Tab

The Competitive Analysis tab contains two portlets that provide general information for a marketing or product manager.

To view these portlets, click Portfolios in the Portfolio Management menu. Click the NPD Product Master link and then click the Competitive Analysis tab.

Competitive Comparison [Plan of Record]

The Competitive Comparison [Plan of Record] portlet is a bubble chart that displays individual products based on their product category (e.g., new to world or new to company). It displays the current plan of record for a product portfolio (the portfolio must have products in it for this bubble chart to work).

It compares the metrics for the competition rating on the X axis and the customer value perception on the Y axis. This portlet helps product analysts review competitive information in the plan of record as compared to a scenario.

The legend lists each of the following attributes along with the colors:

X Axis

Competition Rating.

Y Axis

Customer Value Perception.

Bubble Color

The bubble color represents the product category.

Bubble Size

Market Share

The following portlet filters are available:

Planned Cost

Enter a range for the planned cost.

Finish Date

Enter a date range.

Competitive Comparison [Competitors]

The Competitive Comparison [Competitors] bubble chart is very similar to the Competitive Comparison [Plan of Record] portlet. It also displays individual products based on their product category, except it displays for a selected scenario, rather than the plan of record.

It compares the metrics for the competition rating on the X axis and the customer value perception on the Y axis. This portlet helps product analysts review competitive information in the plan of record as compared to a scenario.

The legend lists each of the following attributes along with the colors:

X Axis

Competition Rating.

Y Axis

Customer Value Perception.

Bubble Color

The bubble color represents the product category.

Bubble Size

Market Share

The following portlet filters are available:

Planned Cost

Enter a range for the planned cost.

Finish Date

Enter a date range.

Role Comparison Tab

The Role Comparison tab contains two portlets that provide general information for a marketing or product manager.

To view these portlets, click Portfolios in the Portfolio Management menu. Click the NPD Product Master link and then click the Role Comparison tab.

Role Capacity and Demand [Plan of Record]

The Role Capacity and Demand [Plan of Record] portlet displays individual roles that are associated to the portfolio along with allocation, availability, and the variance between those two. It displays the current plan of record for the portfolio and current role plans across selected time periods.

This portlet helps product analysts review resource assignments in the plan of record as compared to a scenario.

The following columns are displayed on this portlet:

Role

The portfolio name. Click the name to open the Role Properties page.

Availability

This is the available hours across all the resources that belong to this role and this portfolio, and it is specific to the time period (e.g., monthly or quarterly).

Allocation

This is the allocated hours across all the resources that belong to this role and this portfolio, and it is specific to the time period (e.g., monthly or quarterly).

Variance

A red or green stoplight will display based upon the calculation of subtracting the allocation from the availability.

The following portlet filters are available:

Month(s)

Click the Browse icon to pick one or more months/years for display in the portlet.

Role Capacity and Demand [Compare to Scenario]

The Role Capacity and Demand [Compare to Scenario] grid portlet displays individual roles that are associated to the portfolio along with allocation, availability, and the variance between those two. It is the companion portlet to the Role Capacity and Demand [Plan of Record] portlet, and it displays a selected scenario with role plans across selected time periods. This portlet helps product analysts review resource assignments in the plan of record as compared to a scenario.

The following columns are displayed on this portlet:

Role

The portfolio name. Click on the name to drill down to the Role Properties page.

Availability

This is the available hours across all the resources that belong to this role and this portfolio, and it is specific to the time period (e.g., monthly or quarterly).

Allocation

This is the allocated hours across all the resources that belong to this role and this portfolio, and it is specific to the time period (e.g., monthly or quarterly).

Variance

A red or green stoplight will display based upon the calculation of subtracting the allocation from the availability.

The following portlet filters are available:

Month(s)

Click the multi-select browse icon to pick one or more months/years for display in the portlet.

Project Master Portfolio Page Layout

The Project Portfolio Page Layout is a set of tabs and portlets you can select as the layout when viewing a portfolio. This layout is built for project managers who need to view groups of projects in order to review statistical trends and metrics.

Scorecard Tab

The Scorecard Tab contains two portlets that display metrics about the project in the portfolio.

To view these portlets, click Portfolios in the Portfolio Management menu. Click the NPD Project Master link and then click the Scorecard tab.

Projects

The Projects portlet is a listing of all the projects in the selected portfolio. It shows a variety of metrics with graphics for easy viewing of project status. It also includes costs, ROI, and NPV. This portlet is reminiscent of the Idea Vault, but instead of ideas, you have projects in all the different statuses and states of execution.

The following columns are displayed on this portlet:

Project

The name of the project. Click on the name to drill down to the Project Properties page.

Hierarchy Icon

Click the icon to drill down to the Project Hierarchy page.

Grid with Plus (Add to Scenario) Icon

Click the icon to drill down to the Portfolios Scenarios page.

Gate Score

The stoplight icon and gate score number (from the project or idea gate score field).

Gate Decision

The current gate decision represented by a colored, directional arrow.

Stage

The current stage of the project.

Customer Market

The customer market selection on the project.

Product Category

The selected product category on the project.

Ranking

An attribute on the project that allows selection of a number between 1 and 10 to rank projects in order from most to least important.

Planned Revenue

Total planned revenue for the project.

Planned Cost

Total planned cost for the project.

Actual Cost

Total actual cost for the project.

Remaining Cost

The difference between actual cost and planned cost.

Planned ROI

ROI percentage from the project.

Planned NPV

NPV percentage from the project.

The following portlet filters are available:

Product Category

Select a category from the drop down list.

Product Line

Select a product line from the drop down list.

Gate Decision

Select a gate decision from the drop down list.

Customer Market

Select a customer market from the drop down list.

Customer Segment

Select a customer market from the drop down list.

Stage

Filter by stage; based on the stage values for NPD.

Gate Score

Filter by gate score; enter a score in the field.

Project Manager

Click the browse icon to filter by project manager.

Stage Gate Review

The Stage Gate Review portlet is a graph that displays all the projects in the portfolio as bubbles based on the stage and cost of the project. It provides you with a visual of where to focus resources and budget and what to be planning for as projects move towards the launch stage.

The legend lists each of the following attributes along with the colors:

X Axis

Projects Grouped by Stage - each section of the graph represents one of the five stages for a project.

Y Axis

Planned Cost - this is the total planned cost from a project.

Bubble Color

The bubble color represents the gate decision.

Bubble Size

Gate Score.

Background Color

A list of the stages with their colors and the placement on the X axis.

The following portlet filters are available:

Gate Decision

Select a gate decision from the drop down list (Go, Kill, Hold, Recycle, All).

Resources Tab

The Resources tab contains one portlet that provides data about role demand.

To view this portlet, click Portfolios in the Portfolio Management menu. Click the NPD Project Master link and then click the Resource Demand on Projects tab.

Resource Demand on Projects

The Resource Demand on Projects portlet highlights the total resource and role hours per project and includes start and end dates as well as planned cost. Portfolio managers can easily link back to the scenarios tab to play with increasing or decreasing roles for these projects.

The following columns are displayed on this portlet:

Project

The name of the project. Click on the name to drill down to the Project Properties page.

Grid with Plus (Add to Scenario) Icon

Click the icon to drill down to the Portfolios Scenarios page.

Ranking

An attribute on the project that allows selection of a number between 1 and 10 to rank projects in order from most to least important.

Start

The start date of the project.

Finish

The finish date of the project.

Role Demand

The total number of resource/role hours needed, based on the start and end date for the portfolio. This value will not mirror the total amount of hours on the project if the project falls outside of the range for the portfolio.

Planned Cost

Total planned cost for the project.