The Current Issues portlet displays issues within the next 45 days (default) or number of days entered in the Days Outlook filter, grouped by priority across projects. Issues are not included in this portlet if their status is “Resolved” or “Closed”.
Data is displayed as a pie chart. Each pie segment reflects the number of issues by priority, giving an overall view of a project status in terms of issues raised. Click a pie slice to open the details of the issue on the Current Issues Drill Down page. The Current Issues Listing portlet on this page displays details about issues within the days outlook range.
|
Copyright © 2014 CA Technologies.
All rights reserved.
|
|