This section describes the upgrade of a Winter 2012 instance CA Clarity Agile from a Spring 2011 release.
Important: Plan to complete upgrade to CA Clarity Agile Winter 2012 at the same time that you upgrade to CA Clarity Requirements and the CA Clarity Agile Add-In for CA Clarity PPM. Completing the upgrades at the same time helps ensure that the release levels are the same.
Required: Upgrade from Version 2.10. If you have a previous release installed, you must upgrade to V2.10 before upgrading to V3.0.
The upgrade process for CA Clarity Agile requires multiple tasks for the administrator to prepare, upgrade, and deploy. The high-level tasks for the upgrade process include:
Follow these steps:
| Copyright © 2012 CA. All rights reserved. |
|