Previous Topic: Add a Resource Role for a RequirementNext Topic: Attach a Note or Attachment to a Requirement


Estimate the Effort for a Resource Role

Follow these steps:

  1. Click Requirements, and from Detailed Planning, click Requirements.
  2. Select the requirement and click Details.

    The detail page for the requirement opens.

  3. In the Role section, locate the role and click in the Labor Effort column on the row, then enter the full-time estimated hours.

    A red arrow appears in the upper left of the Labor Effort cell, indicating an editing change has been made but not saved.

  4. Save your changes.