Any changes made to the requirements for a release after the baseline is created, do not appear under the current baseline. Create another baseline and you can do a comparison of the two baselines.
Follow these steps:
The Release Details page appears.
The result shows a comparison of the requirements between the two baselines.
|
Copyright © 2013 CA.
All rights reserved.
|
|