ACE2 is subdivided into several main components. Each component is responsible for a specific part of the calculation management process.
The following are the Components:
Maintains a repository of all the tasks handled by ACE2 according to events received from the CONTRACT Bridge.
Handles the connection between a task and the resources related to it through metric registration.
Supplies answers regarding the resources tree structure and the effect of a change in the resources tree.
Aggregates the effect external events have on tasks. Calculation Boundaries determine the lower and upper bounds of the next calculation. The earliest event received determines the lower bound. The upper bound limits are based on these events:
Calculations are not initiated when no events occur in the system.
Initiates calculations based on the decisions made by the Analyzer. The scheduler divides the calculations into homogeneous units. If the analyzer identifies a need for a preceding recalculation, the scheduler stops a recalculation.
|
Copyright © 2012 CA.
All rights reserved.
|
|