Previous Topic: Admin Misc - System StatisticsNext Topic: Admin ACE2 - Current Calculation Status by Contract


Admin PSL - Calculation Status

The Calculation Status report displays the rule calculation status at the agent level, and includes the following columns:

Contract

The name of the contract.

Rule

Name of the metric.

Tracking Period

The metric tracking period: HOUR, DAY, WEEK, MONTH, QUARTER, YEAR.

Update Up To

The date and time of the most current calculation results.

Last Cycle Begin At

The date and time when the last metric cycle began.

Requires Recalculation From

The date and time of the state from which ACE1 recalculates. If no recalculation is required, this field is blank.

Last Update At

The date and time when the agent (defined by the contract, rule and tracking period) was last updated.

Handled by Engine #

The ACE1 instance number (N).