The status of the calculated data lock date of a specific contract can be changed directly from the Contracts page. This option is available for contracts whose status is Effective, Not Effective and Archived only.
Follow these steps:
No lock date exists and no request for a lock date was issued.
A lock date exists and no request for a lock date was issued.
A request for a lock date was issued, but not yet completed.
If the Previous lock date field appears, it displays the existing lock date. If not, no previous lock was issued.
Note: The options listed in the Year and Month drop-down lists are limited to the range defined by the maximum between the minimal purge date in the system configurations table and the calculated date line (which is the date for the specific contract) and the current date.
A confirmation dialog box that also indicates warnings about the selected lock date opens.
To cancel the calculated data lock of a specific contract:
The Calculated Data Lock window opens.
A confirmation dialog box opens.
Note: If the contract’s current lock date is earlier or equal to the minimum lock date (as defined above), the Unlock button is disabled.
|
Copyright © 2013 CA.
All rights reserved.
|
|