Previous Topic: (Optional) Perform a Manual SwitchoverNext Topic: Perform Full System Assured Recovery Testing


Verify Bare Metal Machine Properties

After the switchover process is complete, manually verify that the computer name, operating system, applications, and data components are similar to the original master server.

Note: When the machine is restarted, some drivers could be missing. Manually install these drivers.

Now if you want to run the original forward scenario, perform the Recovering Active Server process to set the recovered master as the Active Server.