Installation and Upgrade Guides › Directory Configuration Guide › Critical Path inJoin Directory Server › Sample Policy Server Settings--Critical Path InJoin Directory Server
Sample Policy Server Settings--Critical Path InJoin Directory Server
The following are sample Policy Server settings:
LDAP
- LDAP IP Address: 12.3.4.5
- Admin Username: cn=manager
- Admin Password: ********
- Confirm Password: ********
- Root DN: o=companyname, c=us
- Use Policy Store: [checked]
- Netscape Certificate Database File: pathname