Previous Topic: Configure an SSL Connection

Next Topic: Sample Policy Server Settings--Critical Path InJoin Directory Server

Sample User Directory Settings--Critical Path InJoin Directory Server

The following are sample user directory settings:

Directory Setup

Credentials and Connection

User Attributes

Note: User attribute names in DMS are or are not case-sensitive on an attribute-by-attribute basis.


Copyright © 2010 CA. All rights reserved. Email CA about this topic