Once the main cost pools have been defined, a total cost of each cost pool can be calculated. First, the activities related to each cost pool are identified and assigned to the appropriate cost pool. To properly trace the expenses to each cost pool, cost drivers have to be identified for each cost element.
To assign a cost element to a cost pool
| Copyright © 2011 CA. All rights reserved. | Tell Technical Publications how we can improve this information |