New and updated stored procedures have been installed, and the Workload Manager needs to be refreshed. You can accomplish this by issuing the VARY command with the REFRESH option as follows:
D WLM,APPLENV=applenvname,REFRESH
See the IBM Z/OS V1R7.0 MVS Systems Commands manual for details.
Your systems programmer may need to complete this task.
Check to make sure that the stored procedure load library is authorized.
| Copyright © 2009 CA. All rights reserved. | Email CA about this topic |