DataManager Batch Processing and Reporting › DataManager Daily Processing (CAKSLOAD) › Preparation Overview
Preparation Overview
Follow these three steps when preparing to run CAKSLOAD:
- Determine the CAKSLOAD control statements which will be used.
- Ensure that all DD statements exist in the JCL.
- Review the contents of the CAIKSPAR data set to ensure that BASE_VERSION is set to the correct version.