SSM also includes a scheduling component that sets the desired state of a resource based on conventional scheduling criteria such as time, date, and day of the week.
The Schedule Manager enables you to define a schedule and periods that set or change the desired state of resources at specific dates and times. For instance, one schedule period might define the desired state for a resource on Monday through Friday, another schedule period might control the desired state on weekends, and a third schedule period might take effect on holidays.
| Copyright © 2011 CA. All rights reserved. | Tell Technical Publications how we can improve this information |