The confirmation panel displays.
In the recalculation process, the oldest selected job step is used as the initial entry; the other job steps are then used in the sequence of their entry date/time (from oldest to most recent).
The number of valid average calculations is set to the number of considered history entries and the Critical/Alerted flag is reset.
| Copyright © 2011 CA. All rights reserved. | Tell Technical Publications how we can improve this information |