3. Installation › 3.5 Generate a Database Unit › 3.5.2 Build Database Unit Libraries
3.5.2 Build Database Unit Libraries
Building the database unit libraries involves two stages.
o First, the COPYLIBS job allocates and initializes the
new database unit libraries by copying initial program,
control, and data members from the database complex
shared libraries.
o Then, after the CA MICS unit installation jobs have been
generated, the COPYLIBU job populates additional unit
library program, control, and data members based on the
products being installed in the unit.
These two jobs are discussed in the following sections:
1 - Create Database Unit Libraries (COPYLIBS)
2 - Populate Database Unit Libraries (COPYLIBU)