Previous Topic: 3.1.6.3 Executing Batch Initiator Simulations

Next Topic: 3.2 Relative Importance

3.1.7 Requirements


The table below shows the CA MICS files and timespan levels
that are required to run the Batch Initiator Simulation
inquiries to model the initiator structure at your
installation.

        -----------------------------------
                                  LEVEL
        CA MICS              -------------
        FILE                 X  D  W  M  Y
        -----------------------------------
        BATJOB                x
        BAT_JS                x
        -----------------------------------


The number of cycles of the DETAIL level BATJOB File that are
maintained at your installation determines the time period
available for modeling.  Only one cycle of the DETAIL level
BAT_JS File is available.