2. PERFORMANCE REPORTING ANALYSIS › 2.9 WLM Goal Mode Analysis › 2.9.3 Standard Output
2.9.3 Standard Output
COMMON ELEMENTS
This section describes elements common to all WLM Goal Mode
Service analysis reports. Options that are unique to a
specific report are documented with that report.
TITLE ELEMENTS
Each report has five lines of title information available.
All reports give the name of the report, the name of the
component, and the run date. In addition, the heading on the
System Storage Usage and Private Storage Usage reports
details the data selected, the summary level of the report,
and the time periods reported by column.
o For the monthly report, the column title is year-month.
o For the weekly report, the week is identified by
month/day/year. The day is determined from the CA MICS
file elements used to generate the report.
o For the daily report, the day is given as month/day/year.
o For the hourly level reports, the hour is given in the
column title along with the month and day as
hour-month/day. The day is determined from the CA MICS
file elements used to generate the report.
The following elements are in the standard title portion of
each report:
Installation On some reports, the installation name that is
Name: defined at CA MICS system installation time.
This value is centered in the first line of the
report. For more information about this value,
ask your system administrator.
Component The name of the CA MICS performance component,
Name: centered in the first or second line of each
page.
Report Name: The name of the report, centered in the third
line of the heading. It cannot be modified.
Sysplex and The sysplex and CA MICS logical SYSID being
SYSID: reported. Data from multiple systems cannot be
combined using standard control parameters.
ZONE: If data is being reported by zone, the zone
number is shown.
Report The date on which the report was run.
Generated:
ADDITIONAL ELEMENTS
Importance: Most reports show the relative importance
assigned to the various service/report class
performance goal types. See the CA MICS data
dictionary entries for elements WLMGOLTP and
WLMGOLRI. In addition, the Performance Manager
Option defines importance level 6 and labels it
Discretionary to give discretionary and 'other'
work an importance distinct from the 'system'
goal, which has a level of zero.
When reporting by WLM Report Class, this
element may show the value Combined Work. This
indicates that more than one workload type
contributed to this report class period, thus
making it a heterogeneous report class period.
Reporting The first row of some reports shows the length
Interval: of time (duration) that contributed to the
report.
% CHANGE: The last column on some reports, this field
is the percent change for each report item
(row) between the base period (first data
column) and the last period (last data column).
If data for only one period is reported, then
dashes (---) are displayed. If the base period
is zero, then N/A is printed to indicate that a
percent change could not be calculated.
The following sections describe the reports produced by the
WLM Goal Mode Service inquiries:
1 - WLM Service Definition Report
2 - WLM Service Delivered Summary, by Service Class
3 - WLM Service Delivered Summary, by Report Class
4 - WLM Service Delivered Summary Report