7. PARAMETERS › 7.3 Unit Level Parameters › 7.3.1 DB2 Processing Options (DB2OPS) › 7.3.1.2 Internal Step RESTART Statements › 7.3.1.2.1 Enable Internal Step Restart
7.3.1.2.1 Enable Internal Step Restart
To enable the internal step restart in the CA MICS DB2
Analyzer, follow the checklist provided below for each unit:
****************************************************
* *
* ENABLE INTERNAL STEP RESTART *
* *
****************************************************
___ 1. Edit prefix.MICS.PARMS(cccOPS), where (ccc) is the
component identifier, and specify:
RESTART YES
For additional information on related topic, review
the documentation for this product on WORK,
RESTARTWORK, and RESTARTCKPT parameters to override
default data set allocation parameters.
___ 2. Submit the job in prefix.MICS.CNTL(cccPGEN).
___ 3. Edit prefix.MICS.PARMS(JCLGENU) so that it contains a
single line that reads:
DAILY
or, if incremental update is enabled for this product
in this unit database, specify:
DAILY INCRccc
where ccc is the product ID.
___ 4. Submit the job in prefix.MICS.CNTL(JCLGENU). Ensure
that there are no error messages in MICSLOG or
SYSTSPRT, that the MICSLOG contains the normal
termination message, BAS10999I, and that the job
completes with a condition code of zero.
___ 5. The following operational job(s) have changed:
DAILY
INCRccc (if incremental update is enabled)
If your site has implemented the operational CA MICS
processes in a scheduling product, the JCL may have
to be refreshed in that product. See the scheduling
product's administrator for the exact processes
involved in updating that product's representation of
the CA MICS jobs.