The VSE/POWER Job Initiation Report quantifies the total
POWER job activity on an hourly basis for the day and VSE
system. The total activity is broken down by whether jobs
met, exceeded, or missed their service objectives.
INTENDED USE:
This report can be used for evaluating the throughput and
turnaround service for all POWER job activity and its
relationship to the system load.
REPORT FORMAT:
This inquiry produces a chart with a vertical and horizontal
axis. The horizontal axis represents the hour of the day and
the vertical axis charts the number of batch jobs initiated
that received the service as indicated: E for exceeded, H
for hit, and M for missed. The management objective is shown
by the dashed horizontal reference line printed across the
chart. A chart is generated for each VSE system.
FREQUENCY The number of jobs started
during the hour
EXCEED The proportion of jobs exceeding
their service objectives
HIT The proportion of jobs meeting
their service objectives
MISS The proportion of jobs missing
their service objectives
HOUR The hour of the day
REPTDATE The date being reported on
A sample of this report is shown in Figure 3-7.
INQUIRY ID:
PWRPD1
DATA SOURCE:
DETAIL.PWRPJB
DATA ELEMENTS USED:
HOUR - Hour of Day
JOBGROUP - Job Group
PJBSRVMS - Jobs Missing Target
PJBSRVEX - Jobs Exceeding Target
PJBSRVMT - Jobs Meeting Target
Daily POWER Job Initiation ABC Company INQUIRY: PWRPD1 RUN DATE: DDMONYY System Identifier=VSE3 FREQUENCY BAR CHART FREQUENCY 70 + | | MM 60 + MM | MM MM | HH MM 50 + HH MM | MM HH MM | MM EE HH 40 + HH EE EE MM | HH EE EE MM | HH EE EE MM 30 + EE EE EE MM | HH EE EE EE MM | HH EE EE EE HH 20 + EE EE EE EE HH | EE EE EE EE EE | EE EE EE EE EE MM HH 10 + EE EE EE EE EE MM HH HH HH | EE EE EE EE EE EE HH MM MM HH HH EE MM EE | EE EE EE EE EE EE EE EE EE EE HH HH EE HH HH EE HH EE MM ------------------------------------------------------------------------------------------------------------ 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 HOUR |------------------------------------------ DDMONYY -----------------------------------------| REPTDATE SYMBOL SERVICE SYMBOL SERVICE SYMBOL SERVICE E EXCEED H HIT M MISS
Figure 3-7. VSE/POWER Job Initiation Objective