Specifies a schedule interval that determines when to run a copy of the job. Modifying the interval does not change the next scheduled start time for the job. See the /INTERVAL qualifier under the SCHEDULE CREATE command for a full description of interval formats.
The /NOINTERVAL default is the same as /INTERVAL=NONE.
| Copyright © 2012 CA. All rights reserved. | Tell Technical Publications how we can improve this information |