When upgrading to CA Identity Manager r12.5 SP8, you may need to migrate the Provisioning Directory to a new system to accommodate requirements for memory or a 64-bit operating system.
To migrate the Provisioning Directory to a new system
Copy the schema files from the local %DXHOME%/config/schema directory to the same directory on the new system.
dxdumpdb -O -f filename -p dc=etadb -S DSA_name database_name
dxserver stop new_system_name-impd-main dxserver stop new_system_name-impd-inc dxserver stop new_system_name-impd-co
dxloaddb -s new_system_name-impd-main filename dxloaddb -s new_system_name-impd-co filename dxloaddb -s new_system_name-impd-inc filename
dxserver start new_system_name-impd-main dxserver start new_system_name-impd-inc dxserver start new_system_name-impd-co
The r12.5 SP8 Provisioning Directory is now running on the new system with all the data from the old system. The old Provisioning Directory can now be removed.
Note: For more information, see the Installation Guide.
Note: Be sure to use the new Provisioning Directory hostname when upgrading the Provisioning Servers. The default in the upgrade installer will be set to the old hostname and must be changed.
Copyright © 2011 CA. All rights reserved. | Email CA Technologies about this topic |