This table shows you where you are in the installation process:
You Are Here |
Step in Installation Process |
---|---|
|
1. Install prerequisite hardware and software and configure your system as required. |
X
|
2. Perform one of these installations:
|
|
3. (Optional) Create separate databases. |
|
4. (Optional) Install the Report Server. |
|
5. (Optional) Install alternate Provisioning Directories, alternate Provisioning Servers, and connector servers to support failover and load balancing. |
Copyright © 2011 CA. All rights reserved. | Email CA Technologies about this topic |