You can control when scheduled reports run, whether you want them to recur, and the recurrence interval.
To set scheduling parameters
Note: If you use daylight savings time in your environment, do not schedule a report during the changeover time, since it will not be generated. For example, if daylight savings time begins at 2 a.m. March 8, you cannot schedule a report between 2:00:00 and 2:59:59.
If you click Save and Close the report is scheduled, otherwise the step you choose appears.
Copyright © 2011 CA. All rights reserved. | Email CA Technologies about this topic |