Use the following INSTJCL members to set up production jobs. The CA Datacom MUF has to be enabled for most of these activities. AD14LXXI is an exception. If you need to execute AD14LXXI, ensure that the MUF is down.
Note: Run the AD14STRT job or STC (Started Task) at a priority just under the priority of the JES subsystem if a CA Datacom/AD is being used with another CA Technologies system product such as CA WA Restart Option for z/OS Schedulers or CA Scheduler.
| Copyright © 2012 CA. All rights reserved. | Tell Technical Publications how we can improve this information |