Previous Topic: Step 3. APF Authorize the Libraries

Next Topic: New Installation Phase

Step 4. Load DB PC Calls Using CAIRIM

This step loads the CA Datacom/DB PC Calls using CAIRIM.

Note: Run this step before attempting any of the new installation jobs.

  1. Retrieve member AXRIM01 from your INSTJCL library.
  2. Make the required global changes (see the instruction block).
  3. Submit the JCL to complete this step.
  4. Review the output for successful completion.
  5. Expected condition code is 00.
  6. Review, edit, execute, and complete this step before continuing.

For a list of the MUF startup options that can apply to your installation, and for an updated list of DBSIDPR macro parameters, see the CA Datacom/DB Database and System Administration Guide.

Important! Install the PC Calls on every machine that might run the MUF region, a DBUTLTY job, or make a database request through the Cross-System Coupling Facility (XCF).