Project Management › New Gantt Page
New Gantt Page
The Work Breakdown Structure (WBS) page has changed. The previous WBS page has been removed and replaced with a new Gantt editor page. There are functional differences between the previous WBS page and the v13 Gantt editor. The new Gantt editor includes drag-and-drop, inline insert, toolbar, and full hierarchy support.
Navigation to the new Gantt editor page has changed:
- The Gantt button on the Task List page has been removed.
- The Gantt editor opens in its own browser window.
- New Studio links have been provided to the Gantt editor. Note the following that occurs during an upgrade:
- Fields configured to link to the previous WBS page are removed from the configuration for the list or portlet. If the field is a custom-added virtual field, redefine the field and select the new link to the new Gantt editor.
- Fields configured to link to the previous pop-up graphical Gantt chart are replaced by a link to the new Gantt editor.
See the Project Management User Guide for more information about the new Gantt page.
Preupgrade action: Review your Studio configurations to identify lists and grid portlets that contain links to the WBS page. The upgrade removes these fields from the list or portlet.
Upgrade action:
- If you configured the WBS view in your previous release, reapply your Studio and end-user configurations to the new Gantt page.
- If you previously configured lists or grid portlets with fields that linked to the WBS page, redefine the fields and add a link to the new Gantt editor.