Pop-up menus can be used to perform various operations with the Job Status Manager. These pop-up menus appear in both the left (Server Browser) and right (Job Queue) panes.
To access a pop-up menu, with the pointer on a selection in the left or right panel, right-click the mouse.
Note: When accessing a pop-up menu in the Browser, the pointer must be on a selected group, server, or object. When accessing a pop-up menu in the Job Queue, a job must be selected.
Job Status Tab Pop-Up Menu
To access the Job Queue pop-up menu, with the Job Queue tab selected, right-click a highlighted job. The Job Queue menu appears with the following options:
If you select the Run Now option for a repeating, rotation, or GFS rotation job, the following conditions apply:
The job runs immediately and the existing schedule is not affected unless the time it takes to run the job overlaps with the next scheduled run. In this scenario, the scheduled run is skipped for that day. For example, if you have a job scheduled to run Monday through Friday at 9:00 p.m., you select Run Now at 6:00 p.m. and it does not finish till 10:00 p.m., the 9:00 p.m. scheduled run for that day is skipped.
The backup method used for the job is the same backup method that will be used for the scheduled run that day. For example, if you have an incremental backup job scheduled for 9:00 p.m. and select Run Now at 6:00 p.m., the job that runs at 6:00 p.m. will be an incremental backup. If you select Run Now on a day that does not have a scheduled run, the backup method of the next scheduled job will be used. For example, if you have an incremental job scheduled to run Monday and you select Run Now on Saturday, the job that runs on Saturday will be an incremental backup.
You cannot use the Delete Job option on an active job. Use the Stop Job option if you want to delete an active job that repeats at intervals (determined when you create the job). Selecting the Delete Job button will interrupt and remove the job completely from the queue, and it will not be rescheduled. You will have to recreate the job if you did not save it to a script file.
You can resize these columns by using the "drag and drop" method with the mouse. Place the cursor on the divider between columns, click and hold down the left mouse button, and then move the divider in either direction until the column is the size you want.
Detail/Log Tab Pop-Up Menu
If you are viewing information in the Detail or Log tab, right-click to display a pop-up menu to change fonts, print, or find information.
| Copyright © 2010 CA. All rights reserved. | Email CA about this topic |